Ngezi Phase 3A growth project, Zimbabwe – update

Image of Ngezi concentrator

Photo by Zimplats

10th March 2023

By: Sheila Barradas

Creamer Media Research Coordinator & Senior Deputy Editor

     

Font size: - +

Name of the Project
Ngezi Phase 3A growth project.

Location
Zimbabwe.

Project Owner/s
Zimplats.

Project Description
The project entails the construction of the initial 900 000 t/y module at Ngezi's third concentrator plant, which will increase milling capacity from 6.7-million tonnes to 7.6-million tonnes a year.

The project will add 80 000 oz of platinum, palladium, rhodium, iridium, ruthenium and gold a year to production capacity.

The project includes a mining fleet and infrastructure.

Potential Job Creation
Not stated.

Net Present Value/Internal Rate of Return
Not stated.

Capital Expenditure
The concentrator plant is estimated at $94-million and the mining fleet at $18-million.

Planned Start/End Date
Not stated.

Latest Developments
Implats has reported in its results for the period ended December 31, 2023, that the third concentrator has been commissioned and optimised.

Key Contracts, Suppliers and Consultants
None stated.

Contact Details for Project Information
Zimplats, tel +44 1481 737217 or email info@zimplats.com.
Impala Platinum, tel +27 11 731 9000 or email investor@implats.co.za.

To watch Creamer Media's latest video reports, click here
 

Edited by Creamer Media Reporter

Comments

Showroom

Sandvik Drills image
Sandvik Mining and Rock Solutions

For more than 150 years, Sandvik has remained committed to developing the most advanced engineering solutions. As a world-leading mining equipment...

VISIT SHOWROOM 
AMS Haden Instrument & Mining Services (pty) Ltd
AMS Haden Instrument & Mining Services (pty) Ltd

AMS Haden is well known in the industry and we have been called on to provide advice on many projects.

VISIT SHOWROOM 

Latest Multimedia

sponsored by

Photo of Martin Creamer
On-The-Air (29/09/2023)
29th September 2023 By: Martin Creamer
Magazine round up | 29 September 2023
Magazine round up | 29 September 2023
29th September 2023

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION







sq:0.066 0.116s - 92pq - 2rq
Subscribe Now