https://www.miningweekly.com

Monarch aims to restart Beaufor in next 8 to 14 months

The Beaufor mine, in Val-d'Or

The Beaufor mine, in Val-d'Or

29th January 2021

By: Mariaan Webb

Creamer Media Contract Publishing Editor

     

Font size: - +

Gold miner Monarch Mining is continuing to advance exploration at the Beaufor mine, in Val-d’Or, Quebec, with the goal of growing the resource and restarting production in a timeframe that takes advantage of the favourable gold market.

The latest resource estimate for Beaufor confirms that there is still significant mineralisation in the mine, CEO Jean-Marc Lacoste said on Thursday.

It is the company’s goal to restart the mine in the next 8 to 14 months, he added.

The 2020 mineral resource estimate area covers a strike length of about 1.5 km by a width of 900 m, down to vertical depth of 1 200 m below the surface. The estimate indicates that measured resources of 121 000 t at 5.62 g/t for 21 900 oz and indicated resources of 310 100 at 7.10 g/t for 70 800 oz.

Inferred resources are 134 600 t at 6.96 g/t for 30 100 oz.

Commercial production at Beaufor began in the early 1930s and over the years it has produced more than 1.1-million ounces.

Edited by Creamer Media Reporter

Article Enquiry

Email Article

Save Article

Feedback

To advertise email advertising@creamermedia.co.za or click here

Showroom

Alcohol Breathalysers
Alcohol Breathalysers

Supplier & Distributor of the Widest Range of Accurate & Easy-to-Use Alcohol Breathalysers

VISIT SHOWROOM 
Alco-Safe
Alco-Safe

Developed to exceed the latest EN 15964 standards for police breathalysers proving that it will remain accurate and reliable for many years to come.

VISIT SHOWROOM 

Latest Multimedia

sponsored by

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION







sq:0.042 0.85s - 110pq - 2rq
Subscribe Now