https://www.miningweekly.com

Mogale Gold tailings storage facilities, South Africa – update

Image of Mogale tailings dump

Photo by Pan African Resources

21st July 2023

By: Sheila Barradas

Creamer Media Research Coordinator & Senior Deputy Editor

     

Font size: - +

Name of the Project
Mogale Gold tailings storage facilities (TSFs).

Location
Near Krugersdorp, to the west of Johannesburg, in Gauteng, South Africa.

Project Owner/s
Pan African Resources.

Project Description
The Mogale Gold TSFs comprise various individual dams containing a probable mineral reserve of 123.6-million tonnes of remineable material at a head grade of 0.29 g/t for an estimated content of 1.14-million ounces of gold.

The Mogale Gold project has the potential to increase Pan African’s gold production profile over the coming years.

Remining the Mogale Gold TSFs is expected to add about 50 000 oz/y of production over its 13-year life-of-mine (LoM). The project entails low unit-cost hydromining, with low project execution risk, at 800 000 t a month using a carbon-in-leach plant, similar to Pan African’s Elikhulu operation currently processing 1.2-million tonnes a month, with up to 900 000 t a month achievable without negatively affecting performance.

The addition of Mintails’ Soweto Cluster resource has the potential to extend the LoM from 13 years to 21 years and further increase yearly gold production.

Potential Job Creation
Not stated.

Net Present Value/Internal Rate of Return
The project has a pretax net present value, at a 9.5% real discount rate, of R1.01-billion and a real ungeared internal rate of return of 20.1%. Construction capital payback is estimated within 3.5 years after commissioning.

Capital Expenditure
Construction capital expenditure is estimated at R2.46-billion.

Planned Start/End Date
Pan African envisages starting construction in 2023 and commissioning the project between July and December 2024. 

This project is expected to be at steady-state production during the first half of the 2025 calendar year.

Latest Developments
The official sod-turning ceremony for the construction of the Mogale tailings retreatment project is set to take place in July.

Key Contracts, Suppliers and Consultants
DRA Projects (definitive feasibility study).

Contact Details for Project Information
Pan African Resources, tel + 27 11 243 2900 or email info@paf.co.za.

To watch Creamer Media's latest video reports, click here
 

Edited by Creamer Media Reporter

Article Enquiry

Email Article

Save Article

To advertise email advertising@creamermedia.co.za or click here

Showroom

Lilak Aluminium
Lilak Aluminium

For over 15 years, Lilak Aluminium, a trusted leader in architectural extrusion supply, has delivered excellence to businesses like yours.

VISIT SHOWROOM 

Latest Multimedia

sponsored by

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION







sq:0.056 0.082s - 111pq - 2rq
Subscribe Now