https://www.miningweekly.com
Africa|Coal|Construction|Materials Handling|Mining|PROJECT|Project Management|Resources|Underground|Equipment|Maintenance
Africa|Coal|Construction|Materials Handling|Mining|PROJECT|Project Management|Resources|Underground|Equipment|Maintenance
africa|coal|construction|materials-handling|mining|project|project-management|resources|underground|equipment|maintenance

Matla life-of-mine project, South Africa – update

26th March 2021

By: Sheila Barradas

Creamer Media Research Coordinator & Senior Deputy Editor

     

Font size: - +

Name of the Project
Matla life-of-mine project.

Location
The project is located in Mpumalanga, South Africa.

Project Owner/s
Exxaro Resources (project management and mining) and Eskom (funding).

Project Description
The Matla mine has been on care and maintenance since 2016.The 42-year-old operation comprises three underground mines.

The project involves the construction of a new decline shaft, including a boxcut with bulk materials handling facility, to gain access to the remaining economical two-seam reserves.

The project also includes plans to supply Mine 1 with five complete suites of underground continuous mining equipment, interseams between Mine 2 and Mine 3, and a ventilation shaft to supply fresh air to Mine 3’s future production areas.

The project will have a capacity of four-million tonnes of coal a year, bringing the total production from the Matla operation to ten-million tonnes a year for the remainder of its mine life to 2042.

Potential Job Creation
Not stated.

Net Present Value/Internal Rate of Return
Not stated.

Capital Expenditure
Eskom is funding the R3.4-billion cost of the relocation project, while Exxaro remains responsible for the project management and mining.

Planned Start/End Date
Construction started in the second half of 2020, with first production from Mine 1 expected to start in the second half of 2023.

Latest Developments
Construction has started.

Key Contracts, Suppliers and Consultants
None stated.

Contact Details for Project Information
Exxaro Resources investor relations executive head of stakeholder affairs Mzila Mthenjane, tel +27 12 307 7393 or email investorrelations@exxaro.com.

Edited by Creamer Media Reporter

Comments

Latest News

Showroom

GreaseMax
GreaseMax

GreaseMax is a chemically operated automatic lubricator.

VISIT SHOWROOM 
SABAT
SABAT

From batteries for boats and jet skis, to batteries for cars and quad bikes, SABAT Batteries has positioned itself as the lifestyle battery of...

VISIT SHOWROOM 

Latest Multimedia

sponsored by

Magazine round up | 06 December 2024
Magazine round up | 06 December 2024
6th December 2024

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION







sq:0.102 0.139s - 128pq - 2rq
Subscribe Now