Klondex production rallies as mine, mill tons rise
TORONTO (miningweekly.com) – TSX- and Nasdaq-listed Klondex Mines reported record output for the second quarter ended June 30, saying it is making progress to meet its full-year guidance.
During the period, the Vancouver-headquartered company produced 41 400 gold equivalent ounces (GEO) from its Fire Creek and Midas mines, in Nevada. For the six months, Klondex produced 71 600 oz, as the company achieved higher mining and milling rates.
"We achieved record GEO production for the company in the second quarter and are on our way to accomplish our goal of filling the Midas mill. We are well positioned to meet our production guidance for the year as we expect our mining rates and mill head grades to be consistent with the second-quarter results, or even improve slightly, according to our mine plans,” CEO Paul Huet advised on Monday.
According to Klondex, the average head grades at Fire Creek improved quarter-over-quarter, as it mined higher-grade zones, while mine sequencing boosted the head grade at Midas.
The company expected the mill head grades at Midas to progressively increase throughout the year. Average silver recovery rates were slightly lower than expected owing to higher mill throughput, which reduced ore retention time in the leach tanks.
For the full year, Klondex expected to produce 145 000 GEO to 150 000 GEO, in line with its previous guidance.
Huet also noted that it continued to make strong progress at the True North mine, in Canada, and expected to be in a position to make a production decision in the third quarter.
Article Enquiry
Email Article
Save Article
Feedback
To advertise email advertising@creamermedia.co.za or click here
Announcements
What's On
Subscribe to improve your user experience...
Option 1 (equivalent of R125 a month):
Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format
Option 2 (equivalent of R375 a month):
All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors
including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.
Already a subscriber?
Forgotten your password?
Receive weekly copy of Creamer Media's Engineering News & Mining Weekly magazine (print copy for those in South Africa and e-magazine for those outside of South Africa)
➕
Recieve daily email newsletters
➕
Access to full search results
➕
Access archive of magazine back copies
➕
Access to Projects in Progress
➕
Access to ONE Research Report of your choice in PDF format
RESEARCH CHANNEL AFRICA
R4500 (equivalent of R375 a month)
SUBSCRIBEAll benefits from Option 1
➕
Access to Creamer Media's Research Channel Africa for ALL Research Reports on various industrial and mining sectors, in PDF format, including on:
Electricity
➕
Water
➕
Energy Transition
➕
Hydrogen
➕
Roads, Rail and Ports
➕
Coal
➕
Gold
➕
Platinum
➕
Battery Metals
➕
etc.
Receive all benefits from Option 1 or Option 2 delivered to numerous people at your company
➕
Multiple User names and Passwords for simultaneous log-ins
➕
Intranet integration access to all in your organisation














