https://www.miningweekly.com

Kibo says Tanesco tender to resume shortly

2nd November 2018

By: Creamer Media Reporter

     

Font size: - +

An announcement by the Tanzania Electricity Supply Company (Tanesco) cancelling three tenders for large solar power, coal-fired generation projects and large wind power projects is “unfortunate, but not out of the ordinary”, dual-listed Kibo Energy CEO Leon Coetzer said on Friday.

The company, which trades on the London and Johannesburg stock exchanges, stated that it was its understanding that a tender to do a feasibility study, finance, build, own, operate and transfer coal power projects of between 150 MW and 300 MW in one location would “definitely still going ahead” and that it was not affected by the Tanesco announcement.

However, there were certain procedural amendments required to the process before the tender could proceed, although these should not impact the expected timeline for the completion of the tender process.

Kibo last month submitted formal tender qualification documents to Tanesco for its Mbeya coal-to-power project (MCPP).

“We are looking forward to resuming the tender process shortly. In a rather curious manner the company welcomes the brief respite in respect of the MCPP process allowing us to bolster our efforts in Botswana and Mozambique, where multiple work streams are constantly gaining in momentum to see the ongoing technical studies and power purchase agreement negotiations for the Mabesekwa Independent Coal to Power Project and Benga Independent Power Project completing ahead of schedule,” Coetzee said.

Shares in Kibo fell by as much as 31% to 1.43p on the London bourse on Friday, before recovering to 1.9p by the afternoon. The stock traded unchanged at 55c on the JSE.

Edited by Mariaan Webb
Creamer Media Contract Publishing Editor

Article Enquiry

Email Article

Save Article

Feedback

To advertise email advertising@creamermedia.co.za or click here

Showroom

Werner South Africa Pumps & Equipment (PTY) LTD
Werner South Africa Pumps & Equipment (PTY) LTD

For over 30 years, Werner South Africa Pumps & Equipment (PTY) LTD has been designing, manufacturing, supplying and maintaining specialist...

VISIT SHOWROOM 
Lilak Aluminium
Lilak Aluminium

For over 15 years, Lilak Aluminium, a trusted leader in architectural extrusion supply, has delivered excellence to businesses like yours.

VISIT SHOWROOM 

Latest Multimedia

sponsored by

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION







sq:0.043 0.942s - 110pq - 2rq
Subscribe Now