Far West Gold Recoveries project, South Africa

20th March 2020

By: Sheila Barradas

Creamer Media Research Coordinator & Senior Deputy Editor

     

Font size: - +

Name of the Project
Far West Gold Recoveries (FWGR) project.

Location
Gauteng, South Africa.

Project Owner/s
DRDGold's acquisition of Sibanye's FWGR assets was finalised on July 31, 2018.

Following the successful implementation of the transaction between the two companies, Sibanye-Stillwater now owns 38.05% of the issued share capital of DRDGold.

Under the terms of the transaction, entered into in November 2017, Sibanye agreed to exchange selected surface gold processing assets and tailings storage facilities (TSFs) for shares in DRDGold.

Sibanye also has an option to subscribe for further shares in DRDGold, enabling it to potentially hold up to 50.1% of DRDGold within 24 months at a 10% discount.

Project Description
The FWGR will be rolled out in a phased approach.

According to DRDGold, the first phase, including early-stage production, design and planning over a 24-month period, will involve upgrading the Driefontein 2 and 3 plants to process tailings from the Driefontein 5 dump at between 400 000 t a month and 600 000 t a month, depositing the residue on the Driefontein 4 tailings dam.

Phase 2 envisages the construction of a high-volume central processing plant capable of processing 1.2-million tonnes a month and the development of a new regional TSF.

In this phase, reclamation will initially be from the Driefontein 3, Libanon and Kloof 1 dumps, and then from the Ventersdorp North and South dumps. The scale of the infrastructure established in this phase will allow for reclamation from other sources in the region.

Phase 2 is expected to extend the life of the operation from five years to 20 years.

As an alternative to Phase 2, or if Phase 2 is delayed, Phase 1 can be extended by blending in material from the Driefontein 3 dump. Envisaged is the treatment of 77.7-million tonnes from the Driefontein 3 and 5 dumps, and a further upgrade of the Driefontein 4 tailings dam.

Potential Job Creation
Not stated.

All-in Sustaining Costs/All-in Costs
All-in sustaining costs are estimated at R260 349/kg.

Net Present Value/Internal Rate of Return
DRDGold estimates the net present value (NPV) of the entire FWGR at R2.1-billion.

The estimated NPV of the alternative option is R2.7-billion, assuming a capital outlay of R397-million in addition to the initial Phase 1 capital outlay.

Capital Expenditure
DRDGold invested R330-million on Phase 1.

The cost of Phase 2 will depend on whether DRDGold chooses to build a second plant and TSF or if it expands the existing plant and TSF capacity.

Planned Start/End Date
The miner reached commercial production of Phase 1 in April 2019.

Phase 2 is planned to be completed in 2024/5.

Latest Developments
DRDGold achieved planned throughput of 500 000 t/m at Phase 1 during the first quarter of the 2020 financial year.

It is now progressing the studies required to realise Phase 2 of FWGR.

Key Contracts and Suppliers
None stated.

On Budget and on Time?
Not stated.

Contact Details for Project Information
R&A Strategic Communications James Duncan, on behalf of DRDGold, tel +27 11 880 3924, fax +27 11 880 or email james@rasc.co.za.

Edited by Creamer Media Reporter

Article Enquiry

Email Article

Save Article

To advertise email advertising@creamermedia.co.za or click here

Showroom

Stewarts & Lloyds
Stewarts & Lloyds

Stewarts & Lloyds is a leading steel, tube, and engineering product supplier in South Africa.

VISIT SHOWROOM 
Trotech
Trotech

Design, Construction and Maintenance of Site Erected, Welded Bulk Storage Tanks for the Petrochemical, LNG, Ammonia and Sustainable fuel Sectors.

VISIT SHOWROOM 

Latest Multimedia

sponsored by

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION







sq:0.049 0.741s - 111pq - 2rq
Subscribe Now