https://www.miningweekly.com
Construction|Energy|Infrastructure|Installation|Infrastructure|Operations
Construction|Energy|Infrastructure|Installation|Infrastructure|Operations
construction|energy|infrastructure|installation|infrastructure|operations

enCore restarts Rosita ISR uranium plant

1st December 2023

By: Creamer Media Reporter

     

Font size: - +

NYSE American- and TSX-V-listed enCore Energy has restarted the previously producing Rosita central processing plant (CPP), marking the first step in the company’s south Texas production pipeline strategy using the in-situ recovery production process.

The first shipment of yellowcake is set to occur over the next 45 to 60 days, the miner said on Thursday.   

“It is with great satisfaction that in less than 20 months’ time, the enCore team completed the refurbishment and upgrading of the Rosita CPP from long-term cold standby to monitor well ring installation, wellfield pattern and infrastructure installation, and construction of a new satellite IX facility,” said CEO Paul Goranson.

The Rosita CPP has a capacity to produce 800 000 lb/y of U3O8 and has the ability to expand capacity within the existing licence. The Rosita CPP is designed to process uranium feed from multiple satellite operations, all located in the south Texas area and is one of 11 licenced uranium processing plants in the US, three of which are owned by enCore.

Goranson noted that enCore was the first uranium producer in Texas in ten years and the newest uranium producer in the US.

Edited by Creamer Media Reporter

Comments

Showroom

Rentech
Rentech

Rentech provides renewable energy products and services to the local and selected African markets. Supplying inverters, lithium and lead-acid...

VISIT SHOWROOM 
Schauenburg SmartMine IoT
Schauenburg SmartMine IoT

SmartMine IoT has been developed with the mining industry in mind, to provides our customers with powerful business intelligence and data modelling...

VISIT SHOWROOM 

Latest Multimedia

sponsored by

Photo of Martin Creamer
On-The-Air (26/04/2024)
26th April 2024 By: Martin Creamer
Mining Weekly Editor Martin Creamer
Copper shares soar and green hydrogen goes digital
26th April 2024

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION







sq:0.121 0.177s - 93pq - 2rq
1:
1: United States
Subscribe Now
2: United States
2: