Large, low-cost PGM mine can be developed at Waterberg JV project, study shows
An independent definitive feasibility study (DFS) into the Waterberg joint venture (JV) project, in South Africa, provides “a clear outline of the world-class nature of the Waterberg palladium deposit and concludes that it can be one of the largest fully mechanised, low-cost platinum group metals mines in the world”, says Platinum Group Metals (PTM) CEO and cofounder R Michael Jones.
The DFS, which was completed by international and South African engineering firms Stantec Consulting International and DRA Projects, along with a team of specialists, was managed by Waterberg JV Resources, representing the JV partners – PTM; Impala Platinum; Japan Oil, Gas & Metals National Corporation; Hanwa; and Mnombo Wethu Consultants.
Highlights of the DFS include a significant increase in mineral reserves from the project’s 2016 prefeasibility study (PFS) for a large-scale, shallow, decline-accessible, mechanised palladium/platinum/rhodium/gold (4E) mine.
The inclusion of the use of backfill in the DFS design lowers risk and increases mined ore extraction rates.
The DFS indicates a steady-state production rate of 420 000 oz of 4E, which is lower than the production rate set out in the PFS. The lower production rate aims to reduce capital costs and simplify construction and ramp-up.
The DFS estimates an after-tax net present value (NPV) of $982-million, at an 8% real discount rate, and an after-tax NPV of $333-million at three-year trailing prices.
The DFS indicates an after-tax internal rate of return of 20.7% at spot prices and 13.3% at three-year trailing prices.
The estimated project capital, according to the DFS, is $874-million, including $87-million in contingencies. Peak project funding is estimated at $617-million.
The DFS indicates that the site life-of-mine average cash cost, inclusive of by-product credits and smelter discounts, for the spot metal price scenario equates to $640/oz of 4E.
There is an updated measured and indicated mineral resources of 242-million tonnes at 3.38 g/t 4E for 26.4-million ounces of 4E, using a 2.5 g/t 4E cutoff, and the deposit remains open on strike to the north and below an arbitrary depth cutoff of 1250 m.
Proven and probable mineral reserves are 187-million tonnes at 3.24 g/t 4E for 19.5-million ounces of 4E.
“The DFS provides a clear outline of the world-class nature of the Waterberg palladium deposit and concludes that it can be one of the largest fully mechanised, low-cost platinum group metals mines in the world,” commented R. Michael Jones in a statement last week.
The company indicated that the project would create about 1 100 new highly skilled jobs. Moreover, considerable investment in local training and business opportunities was part of the benefits to stakeholders including local communities, shareholders, and provincial and national governments.
The project includes an upgrade to the local water infrastructure under a current cooperation agreement with the municipality and a connection to State-owned utility Eskom’s power grid.
Article Enquiry
Email Article
Save Article
Feedback
To advertise email advertising@creamermedia.co.za or click here
Announcements
What's On
Subscribe to improve your user experience...
Option 1 (equivalent of R125 a month):
Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format
Option 2 (equivalent of R375 a month):
All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors
including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.
Already a subscriber?
Forgotten your password?
Receive weekly copy of Creamer Media's Engineering News & Mining Weekly magazine (print copy for those in South Africa and e-magazine for those outside of South Africa)
➕
Recieve daily email newsletters
➕
Access to full search results
➕
Access archive of magazine back copies
➕
Access to Projects in Progress
➕
Access to ONE Research Report of your choice in PDF format
RESEARCH CHANNEL AFRICA
R4500 (equivalent of R375 a month)
SUBSCRIBEAll benefits from Option 1
➕
Access to Creamer Media's Research Channel Africa for ALL Research Reports on various industrial and mining sectors, in PDF format, including on:
Electricity
➕
Water
➕
Energy Transition
➕
Hydrogen
➕
Roads, Rail and Ports
➕
Coal
➕
Gold
➕
Platinum
➕
Battery Metals
➕
etc.
Receive all benefits from Option 1 or Option 2 delivered to numerous people at your company
➕
Multiple User names and Passwords for simultaneous log-ins
➕
Intranet integration access to all in your organisation