Chile miner SQM says brine reduction plan to cost $1.5bn
SANTIAGO - Chilean miner SQM, a major producer of lithium, projects it will need $1.5-billion to execute a plan to cut its extraction of brine in half by 2030, the company said in a statement Wednesday.
In 2020, SQM committed to a 50% reduction in the brine it pumps to mine lithium in the vast Atacama salt flat in northern Chilean.
In a statement, the mining company explained that its Salar Futuro plan will modernize its process of evaporation and brine extraction, improve operating yields and adopt the use of seawater via a desalination plant.
"In a first analysis, it is estimated that investments will be close to $1.5-billion," the firm said.
Authorities have conducted multiple investigations into SQM's brine usage, leading the company to propose a plan to reduce its impact.
The company said a planned desalination plant will provide water with high-saline concentration for its nitrate and iodine plants as well as water to replace freshwater lost through evaporation during the production process.
This will lead to a "totally neutral long-term water balance" and bring its net freshwater usage "to zero".
Despite its reduced brine use, SQM projects an annual production of lithium carbonate equivalent of between 220 000 t and 250 000 t.
The Salar de Atacama is home to almost a quarter of the world's current supply of lithium, a key ingredient in the batteries that power electric vehicles.
Comments
Press Office
Announcements
What's On
Subscribe to improve your user experience...
Option 1 (equivalent of R125 a month):
Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format
Option 2 (equivalent of R375 a month):
All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors
including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.
Already a subscriber?
Forgotten your password?
Receive weekly copy of Creamer Media's Engineering News & Mining Weekly magazine (print copy for those in South Africa and e-magazine for those outside of South Africa)
➕
Recieve daily email newsletters
➕
Access to full search results
➕
Access archive of magazine back copies
➕
Access to Projects in Progress
➕
Access to ONE Research Report of your choice in PDF format
RESEARCH CHANNEL AFRICA
R4500 (equivalent of R375 a month)
SUBSCRIBEAll benefits from Option 1
➕
Access to Creamer Media's Research Channel Africa for ALL Research Reports on various industrial and mining sectors, in PDF format, including on:
Electricity
➕
Water
➕
Energy Transition
➕
Hydrogen
➕
Roads, Rail and Ports
➕
Coal
➕
Gold
➕
Platinum
➕
Battery Metals
➕
etc.
Receive all benefits from Option 1 or Option 2 delivered to numerous people at your company
➕
Multiple User names and Passwords for simultaneous log-ins
➕
Intranet integration access to all in your organisation