https://www.miningweekly.com
Africa|Energy|Flow|Installation|MSA|Renewable Energy|Renewable-Energy|Steel|Storage|Flow|Solutions|Operations
Africa|Energy|Flow|Installation|MSA|Renewable Energy|Renewable-Energy|Steel|Storage|Flow|Solutions|Operations
africa|energy|flow-company|installation|msa|renewable-energy|renewable-energy-company|steel|storage|flow-industry-term|solutions|operations

Bushveld considers four-stage expansion in vanadium output, capex estimated at R2.3bn

Bushveld Minerals CEO Fortune Mojapelo

Bushveld Minerals CEO Fortune Mojapelo

Photo by Creamer Media

22nd June 2022

By: Creamer Media Reporter

     

Font size: - +

Integrated primary vanadium producer and energy storage solutions provider Bushveld Minerals reports that prefeasibility and feasibility studies undertaken to assess the optimal path for increasing production at its Vametco and Vanchem operations to 8 000 t/y will require capital expenditure (capex) of about R2.3-billion.

The studies were undertaken by METC South Africa and MSA Group and were aimed at determining the next phase of the company's growth plans beyond the production run rate of between 5 000 t/y to 5 400 t/y Bushveld expects to achieve by the end of this year.

The studies have determined that a four-stage expansion would be optimal, as it would “substantially reduce” Bushveld's upfront capital requirements and allow for incremental production to be attained from each stage in order to generate additional cash flows, which can be leveraged for the next stage.  

“The studies put us in a position to rapidly respond to growing vanadium demand.

“Growth in demand for vanadium is supported by rising intensity of use within high-strength, low-alloy steel, as well as the significant upside potential for vanadium redox flow batteries given the increasing requirement for energy storage applications for renewable energy sources,” Bushveld CEO Fortune Mojapelo comments.

Stage 1 of the proposed expansion will involve the installation of a semi-autogenous mill at Vametco to establish a permanent and reliable supply of feedstock for both plants in advance of further capacity expansion. 

Additional ore, when required, will be supplied through the development of Bushveld’s Mokopane and Brits mines or from third-party ore.

Stage 2 will involve the refurbishment of Kiln 2 at Vanchem to increase the operation’s production to between 3 600 t/y and 3 700 t/y and the group’s production to between 6 000 t/y and 6 500 t/y.

Stage 3 will entail the refurbishment of Kiln 1 at Vanchem to increase the operation’s production to between 4 600 t/y and 4 700 t/y and group production to between 7 000 t/y and 7 500 t/y.

The final stage will result in Bushveld increasing kiln capacity at Vametco to 3 400 t/y, which will increase group production to between 7 600 t/y and 8 000 t/y.

Bushveld expects the increased volumes and operational efficiencies to result in an at least 20% reduction in costs at the Vametco and Vanchem operations.

Edited by Chanel de Bruyn
Creamer Media Senior Deputy Editor Online

Comments

Showroom

SAIMC (Society for Automation, Instrumentation, Mechatronics and Control)
SAIMC (Society for Automation, Instrumentation, Mechatronics and Control)

Education: Consulting with member companies to obtain the optimal benefits from their B-BBEE spending, skills resources as well as B-BBEE points

VISIT SHOWROOM 
SBS Tanks
SBS Tanks

SBS® Tanks is a leading provider of innovative water security solutions with offices in Southern Africa, East and West Africa, the USA and an...

VISIT SHOWROOM 

Latest Multimedia

sponsored by

PGMs and green hydrogen make headlines
PGMs and green hydrogen make headlines
19th April 2024

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION







sq:0.09 0.127s - 91pq - 2rq
1:
1: United States
Subscribe Now
2: United States
2: