Boikarabelo coal project, South Africa

12th August 2016

By: Mariaan Webb

Creamer Media Contract Publishing Editor

  

Font size: - +

Name and Location
Boikarabelo coal project, Limpopo, South Africa.

Client
Resource Generation (Resgen).

Project Description
In February 2016, Resgen reported that it would implement a revised mine plan at its Boikarabelo coal mine. This followed a technical review of the geological model by an independent expert, which suggested that the revised mine plan could achieve a better opportunity than previously expected. The revised mine plan is based on selective mining and in-pit dumping to maximise productivity and reduce operating costs.

The company will also implement a project development strategy that transfers mine construction risk by appointing a small number of reputable engineering, procurement and construction (EPC) contractors with substantial balance sheets, which will allow for recourse in the event of failure or delay.

The company also plans to implement a strategy to reduce capital costs and minimise risk by appointing a suitably qualified contract miner.

Boikarabelo has probable reserves of 744.8-million tonnes, a measured resource of 1.1-billion tonnes, an indicated resource of 551.7-million tonnes and an inferred resource of 1.5-billion tonnes.

The Boikarabelo coal seam is between 20 m and 30 m below the surface, enabling low-cost, opencut mining. The seam is between 120 m and 130 m thick, with zones of varying-quality thermal and soft coking coal.

The mine will be developed using a two-phased approach to limit upfront capital expenditure. The first phase will deliver about 14-million tonnes of run-of-mine coal a year, which will equate to about six-million tonnes of product coal. Of this, three-million tonnes will be exported and three-million tonnes will be used domestically.

Phase 2, planned for 2022, will involve ramping up production to 20-million tonnes of product thermal coal.

The project includes a 40 km rail link to the existing rail network.

Boikarabelo hosts a life-of-mine of up to 100 years.

Net Present Value/Internal Rate of Return
Not stated.

Value
The estimated capital cost for the project is $480-million.

Duration
Resgen black economic-empowerment (BEE) subsidiary Ledjadja Coal received the Boikarabelo mining rights from the Department of Mineral Resources in April 2011. Initial construction of the mine started in the first quarter of 2013 and is scheduled for completion in September 2018. The mine is expected to begin production in late 2018.

Latest Developments
Ledjadja Coal has secured R5.52-billion to complete the construction of the mine. The BEE subsidiary has agreed on the commercial terms with a financing syndicate to secure the funding. The syndicate includes FirstRand Bank, the Industrial Development Corporation, the Public Investment Corporation and Noble Resources International.

All efforts are now focused on preparing the Boikarabelo coal mine for the mobilisation of the first of the EPC contractors in the fourth quarter of this year.

Resgen signed a heads of agreement with project house Sedgman in May this year for the design, procurement and construction of a $141-million coal-handling and preparation plant at the mine.
.
Key Contracts and Suppliers
Digby Wells Environmental (mining right application, mine-waste licence, environmental authorisation process for power plant); RSV Enco (engineering, procurement and construction management, or EPCM, for mine construction); FLSmidth Roymec (coal-handling and preparation plant); RCE (rail design and construction); Ceenex (water EPCM services); Komatsu Financial Limited Partnership (mobile equipment fleet) and EHL Energy (transmission lines).

On Budget and on Time?
First production has been delayed to late 2018.

Contact Details for Project Information
Resgen (Australia), tel +61 2 9376 9000, fax +61 2 9376 9013 or email info@resgen.com.au; or (South Africa), tel +27 12 345 1057 or fax +27 12 345 5314.
Boikarabelo mine site, tel +27 14 944 0199.
Digby Wells Environmental, tel +27 11 789 9495 or +27 11 504 1400, fax +27 11 789 9498 or +27 11 504 1446, or email info@digbywells.co.za.
RSV Enco, tel +27 11 498 6010, fax +27 11 498 6210 or email enco@rsvenco.com.
RCE, tel +27 12 450 0040 or fax +27 12 450 0060.
FLSmidth Roymec, tel  +27 10 210 4000 or fax +27 10 210 4050.
Ceenex, tel +27 12 347 2620.
Komatsu Financial Limited Partnership, tel +1 888 500 6001 or fax +1 847 437 3199.
EHL Energy, tel +27 11 370 7400 or fax +27 11 834 4203.

Edited by Creamer Media Reporter

Article Enquiry

Email Article

Save Article

To advertise email advertising@creamermedia.co.za or click here

Showroom

Advanced Fire Suppression Technologies
Advanced Fire Suppression Technologies

Established on 1 March, 2000, by Barries Barnard, Advanced Fire Suppression Technologies (AFST) and the Advanced Group stands as Sub-Saharan...

VISIT SHOWROOM 
Virtual Gas Network (Pty) Ltd
Virtual Gas Network (Pty) Ltd

Virtual Gas Network supplies compressed natural gas via a virtual gas distribution network.

VISIT SHOWROOM 

Latest Multimedia

sponsored by

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION







sq:0.045 1.137s - 111pq - 2rq
Subscribe Now