Bafokeng Rasimone Platinum Mine (BRPM) North Shaft Merensky Phase III project, North West, South Africa.

Client
BRPM Joint Venture (JV), comprising Royal Bafokeng Platinum (RBPlat) and Anglo American Platinum (Amplats).

Project Description
The BRPM Phase III project is providing further replacement for Merensky production at the North shaft complex through the extension of the existing decline from Level 10 to Level 15 at the mine boundary. At steady state, Phase III will maintain the production level of North shaft at about 100 000 t/m.

Value
R1.409-billion.

Duration
The project started in November 2010 and is scheduled for completion in 2017.

Latest Developments
The project is 88% complete, against a plan of 81%, with development being 1 158 m, or ten months, ahead of schedule at the end of December 31, 2015.

This has enabled RBPlat to divert some of its most experienced development resources to the Styldrift I development programme and defer the construction of the last two levels (14 and 15)at BRPM to 2017, which will reduce capital expenditure in 2016.

Key Contracts and Suppliers
None stated.

On Budget and on Time?
RBPlat reports that deferring the construction of the last two levels at BRPM will have no impact on the handover dates for those levels or the mine extraction plan as project completion remains on schedule for 2017.

The project remains below budget, with expenditure in2015 amounting to R203-million and a cumulative amount of R992-million for the project to date.

Contact Details for Project Information
RBPlat executive for corporate affairs Mpueleng Pooe, tel +27 10 590 4515 or email mpueleng@bafokengplatinum.co.za.
Amplats corporate communications, Mpumi Sithole, tel +27 11 373 6246, fax +27 11 373 5846 or email Mpumi.sithole@angloamerican.com.

Edited by Creamer Media Reporter

Article Enquiry

Email Article

Save Article

To advertise email advertising@creamermedia.co.za or click here

Showroom

Werner South Africa Pumps & Equipment (PTY) LTD
Werner South Africa Pumps & Equipment (PTY) LTD

For over 30 years, Werner South Africa Pumps & Equipment (PTY) LTD has been designing, manufacturing, supplying and maintaining specialist...

VISIT SHOWROOM 
Lilak Aluminium
Lilak Aluminium

For over 15 years, Lilak Aluminium, a trusted leader in architectural extrusion supply, has delivered excellence to businesses like yours.

VISIT SHOWROOM 

Latest Multimedia

sponsored by

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION







sq:0.044 0.844s - 111pq - 2rq
Subscribe Now