Bafokeng Rasimone Platinum Mine North shaft Merensky Phase 3 project, South Africa
Name and Location
Bafokeng Rasimone Platinum Mine (BRPM) North shaft Merensky Phase 3 project, North West, South Africa.
Client
A joint venture between Royal Bafokeng Platinum (RBPlat) and Anglo American Platinum (Amplats).
Project Description
The BRPM Phase 3 project is providing further replacement for Merensky production at the North shaft complex, through the extension of the existing decline from level 11 to level 15 at the mine boundary.
At steady state, the project will contribute 70 000 t/y of platinum ounces.
Value
R1.17-billion.
Duration
The project is scheduled for completion in the third quarter of 2017.
Latest Developments
RBPlats reports that, at the end of June, the project had progressed to 49% completion against a planned completion of 44%.
Development is 633 m ahead of schedule, with 5 004 m completed against a planned 4 371 m.
Key Contracts and Suppliers
None stated.
On Budget and on Time?
At the end of June this year, the project was 66 days ahead of schedule.
Project completion is forecast at two months ahead of schedule in 2017.
Against a R603-million budget project expenditure to date is at R489-million, with an estimated cost at completion of R1.17-billion representing a saving of R102-million.
Contact Details for Project Information
RBPlat communications manager Kea Kalebe, tel +27 14 573 1487, fax +27 86 219 5131 or email kkalebe@bafokengplatinum.co.za.
Amplats corporate communications, Mpumi Sithole, tel +27 11 373 6246, fax +27 11 373 5846 or email Mpumi.sithole@angloamerican.com.
Article Enquiry
Email Article
Save Article
To advertise email advertising@creamermedia.co.za or click here
Announcements
What's On
Subscribe to improve your user experience...
Option 1 (equivalent of R125 a month):
Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format
Option 2 (equivalent of R375 a month):
All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors
including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.
Already a subscriber?
Forgotten your password?
Receive weekly copy of Creamer Media's Engineering News & Mining Weekly magazine (print copy for those in South Africa and e-magazine for those outside of South Africa)
➕
Recieve daily email newsletters
➕
Access to full search results
➕
Access archive of magazine back copies
➕
Access to Projects in Progress
➕
Access to ONE Research Report of your choice in PDF format
RESEARCH CHANNEL AFRICA
R4500 (equivalent of R375 a month)
SUBSCRIBEAll benefits from Option 1
➕
Access to Creamer Media's Research Channel Africa for ALL Research Reports on various industrial and mining sectors, in PDF format, including on:
Electricity
➕
Water
➕
Energy Transition
➕
Hydrogen
➕
Roads, Rail and Ports
➕
Coal
➕
Gold
➕
Platinum
➕
Battery Metals
➕
etc.
Receive all benefits from Option 1 or Option 2 delivered to numerous people at your company
➕
Multiple User names and Passwords for simultaneous log-ins
➕
Intranet integration access to all in your organisation