https://www.miningweekly.com
Building|Copper|Exploration|Mining|PROJECT|Projects|Drilling
Building|Copper|Exploration|Mining|PROJECT|Projects|Drilling
building|copper|exploration|mining|project|projects|drilling

Aterian undertakes survey of copper/silver project in Morocco

16th January 2023

By: Darren Parker

Creamer Media Contributing Editor Online

     

Font size: - +

London-listed critical metal-focused exploration and development company Aterian has undertaken a review of an induced polarisation (IP) gradient array and high-resolution IP (HIRIP) geophysical survey at its Agdz copper and silver project, in Morocco, located 14 km southwest of the Bouskour copper/silver mine. 

The survey was completed on the northern part of the project in preparation for scout drilling. The review has indicated several high-priority anomalies and increased the target area that is scheduled for further exploration, the company said on January 16. 

Aterian recently acquired Agdz as part of a portfolio of 15 prospective copper/silver and base metal projects covering an area of 762 km2 in Morocco. 

“Agdz is an important asset in our portfolio of 15 copper/silver and base metal projects we recently acquired in Morocco . . . Agdz is the most advanced of the 15 projects and we are doing the necessary work to progress our understanding of the site for drilling.  

“The geophysical survey data has generated several high-priority anomalies requiring additional fieldwork to further resolve these targets,” Aterian chairperson Charles Bray said.

The Agdz project hosts four significant copper/silver prospects covering an area of about 8 km2

Within the Agdz project, the 2.8-km-long Makarn prospect has shown results of up to 8% copper and 448 g/t silver, while the 2-km-long Amzwaro prospect has shown results up to 4.82% copper and 189 g/t silver.  

Additionally, the 150-m-long Minière prospect has yielded results up to 13.05% copper and 12 g/t silver, while the 700-m-long Daoud prospect has yielded results up to 2.71% copper and 152 g/t silver. 

A 137 line kilometre IP gradient array survey has been completed over an area of 14 km2, while 12 HIRIP profiles have been completed to acquire two-dimensional resistivity and chargeability depth sections to depths of about 250 m.  

Several new geophysical anomalies have been identified, while the surveying of key geological structures is under way, along with the outlining of potential mineralised targets for follow-up. 

Previously reported assay results from a limited reconnaissance trenching exercise included 0.65% copper and 36.54 g/t silver over 14.12 m, as well as 0.36% copper and 13.26 g/t silver over 13.70 m. 

“In addition to the known prospects on the project, there are now several new targets identified from the survey for our field teams to further evaluate. We are currently working towards building a conceptual geological model for the project, which has already demonstrated some excellent high-grade copper and silver values,” Bray said. 

He added that the presence of multiple historical copper workings at Agdz was encouraging, with the project being in an established copper and silver mining district in the eastern anti-atlas of Morocco. 

“We are planning to commence fieldwork in quarter one of 2023 on the project and will undertake mechanical pitting and trenching over the anomalies. The commencement of scout drilling based on these outcomes will provide further important geological and grade information shortly thereafter,” Bray said. 

Edited by Chanel de Bruyn
Creamer Media Senior Deputy Editor Online

Comments

Latest News

Marula CEO Jason Brewer
UK-based Marula Mining lists on A2X in South Africa
Updated 3 hours ago By: Marleny Arnoldi

Showroom

Multotec
Multotec

Multotec, recognised industry leaders in metallurgy and process engineering help mining houses across the world process minerals more efficiently,...

VISIT SHOWROOM 
Alco-Safe

Developed to exceed the latest EN 15964 standards for police breathalysers proving that it will remain accurate and reliable for many years to come.

VISIT SHOWROOM 

Latest Multimedia

sponsored by

Magazine round up | 19 April 2024
Magazine round up | 19 April 2024
19th April 2024
Resources Watch
Resources Watch
17th April 2024

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION







sq:0.126 0.162s - 94pq - 2rq
1:
1: United States
Subscribe Now
2: United States
2: