https://www.miningweekly.com

Wesizwe temporarily shuts Bakubung mine amid unprotected strike

24th July 2023

By: Marleny Arnoldi

Deputy Editor Online

     

Font size: - +

JSE-listed Wesizwe Platinum has advised that it closed the Bakubung Platinum mine, in the North West, on July 20 until further notice, owing to an ongoing unprotected strike.

The company says it is working hard to resolve the matter and safeguard employees and assets to ensure sustainability of the mine going forward.

It did not confirm where the strike stems from.

The Bakubung mine is located in the Bushveld Complex, near Rustenburg, and has been riddled with delays to its full construction and commissioning partly owing to technical faults and partly owing to bouts of unrest in the surrounding Ledig community.

The mine is expected to produce 420 000 oz/y of platinum, palladium, rhodium and gold (4E) platinum group metals at steady-state production over a 30-year mine life.

The mine was initially expected to start operating in 2021, then by mid-2022, and again in the second half of this, as noted in its annual report for 2022.

The report details Wesizwe’s expectation in terms of production as an initial capacity of one-million tonnes a year of run-of-mine ore by the end of June 2024, with the goal of increasing capacity to three-milion tonnes a year by the end of 2027.

Wesiwe has been developing the Bakubung mine since mid-2011.

The annual report states that Wesizwe’s profitability outlook is driven by its production timelines. The company remains focused on generating operational cash flows to offset its fixed cost base once the mine starts producing.

Edited by Chanel de Bruyn
Creamer Media Senior Deputy Editor Online

Comments

The content you are trying to access is only available to subscribers.

If you are already a subscriber, you can Login Here.

If you are not a subscriber, you can subscribe now, by selecting one of the below options.

For more information or assistance, please contact us at subscriptions@creamermedia.co.za.

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION