https://www.miningweekly.com

Taseko rides ‘ideal scenario’ as output rises

9th January 2017

By: Henry Lazenby

Creamer Media Deputy Editor: North America

     

Font size: - +

VANCOUVER (miningweekly.com) – Base metals producer Taseko Mines is finding itself in an “ideal scenario”, as higher full-year and fourth-quarter production, lower costs and higher copper prices conspire to boost its balance sheet.

The Vancouver-based miner, which owns a 75% stake and operates the Gibraltar copper/molybdenum mine, in British Columbia, reported fourth-quarter copper output of 40.7-million pounds, up 23% year-on-year.

Total copper output for the year, at 133.2-million pounds, was down 6% over 2015. Total copper sales for the year were 131.1-million pounds, down 8% on 2015's levels.

Taseko reported on Monday that it managed to maintain mill throughput despite challenging weather conditions in the December quarter, resulting in fourth-quarter copper output increasing by 23% quarter-on-quarter. The increase in copper production was mainly the result of higher copper grades and improved recoveries.

The fourth quarter was the first full quarter the molybdenum plant has operated since it was restarted in September. Taseko said it operated "exceptionally well", with recoveries averaging about 50% for the quarter.

Fourth-quarter molybdenum production was 0.8-million pounds, with the mine having produced 0.9-million pounds of molybdenum in the the four months that the plant operated.

"We are extremely happy with copper and molybdenum production in the fourth quarter. It is a quarter that truly demonstrates the production and cash flow capability of Gibraltar. Higher copper and molybdenum production is having a significant positive impact on unit costs,” stated president and CEO Russell Hallbauer.

He added that several factors that affected Taseko’s profitability had aligned to create an “ideal scenario". “Higher production at a much lower cost, a copper price which has climbed nearly 25% since October and a weak Canadian dollar, which has the Canadian dollar price of copper back to 2011/12 levels. Each of these factors has a significant and an immediate financial impact on our business," Hallbauer said.

The Gibraltar operation is expected to benefit from increasing grades during 2017.

Edited by Mariaan Webb
Creamer Media Senior Deputy Editor Online

Comments

The content you are trying to access is only available to subscribers.

If you are already a subscriber, you can Login Here.

If you are not a subscriber, you can subscribe now, by selecting one of the below options.

For more information or assistance, please contact us at subscriptions@creamermedia.co.za.

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION