https://www.miningweekly.com

Record production narrows Red 5 losses

29th August 2023

By: Esmarie Iannucci

Creamer Media Senior Deputy Editor: Australasia

     

Font size: - +

PERTH (miningweekly.com) – Record gold production has seen ASX-listed Red 5 narrow its losses in the 12 months to June.

Gold production in the full year to June increased from 66 871 oz to 165 544 oz, with gold sales increasing from 64 315 oz to 164 974 oz. Sales revenue for the full year increased from A$164.9-million to A$422.7-million.

Red 5 declared commercial production at its King of the Hills mine, in Western Australia, and has ramped up to steady state production following the completion of its newly constructed processing plant in 2022.

Following the period of increased production and strong gold prices, Red 5 has narrowed its loss from the A$28.6-million reported in the last financial year, to A$8.7-million.

“This is a solid financial result for Red 5 reflecting both the operational ramp-up at our newly commissioned King of the Hills mining and processing hub during the first half of the financial year and the strong performance we have been able to deliver in the second half since commercial production was declared in December 2022. We have also seen a greatly improved safety performance in line with our primary objective to deliver safe, efficient and profitable ounces,” said Red 5 MD Mark Williams.

“Our three mining operations continue to perform in line with the mine plan, and the processing plant is performing well above nameplate capacity, putting Red 5 on track to achieve our stated production and cost guidance for 2024.”

The miner has set a production target of between 195 000 oz and 215 000 oz for the 2024 financial year, at an all-in sustaining cost of A$1 850/oz to A$2 100/oz.

“We continue to deliver positive cash flow from our operations and we are targeting to accelerate our debt repayments in the year ahead. This will provide the company with a robust balance sheet for future growth as we continue to unlock the potential of our long-life King of the Hills mining operation,” said Williams.

Edited by Creamer Media Reporter

Comments

The content you are trying to access is only available to subscribers.

If you are already a subscriber, you can Login Here.

If you are not a subscriber, you can subscribe now, by selecting one of the below options.

For more information or assistance, please contact us at subscriptions@creamermedia.co.za.

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION