https://www.miningweekly.com

Orbite starts HPA production sequence

1st October 2016

By: Henry Lazenby

Creamer Media Deputy Editor: North America

  

Font size: - +

VANCOUVER (miningweekly.com) – Quebec-based clean-tech firm Orbite Technologies has started the production sequence at its high-purity alumina (HPA) plant.

The TSX-listed firm reported on Friday that it had completed commissioning and start-up activities of the digestion circuit, with the first batch of feedstock digestion starting on Friday afternoon. This would be followed by another batch early on Saturday morning.

Orbite reported that the crystallisation circuit was also being commissioned and that the start-up was well advanced, with the first batches of liquor, produced in the digestion circuit, expected to be transferred to the crystallisation circuit over the weekend, for first production of aluminium chloride hexahydrate (ACH) crystals. ACH crystals are the precursor to HPA.

According to Orbite, production will continue in batch mode in these two circuits while it carries out extensive testing on the digester liquors and ACH crystals, to ensure that production and purity criteria are met. Each full digestion and crystallisation batch cycle will initially take about three-and-a-half days to complete.

Once the ACH crystals meet the purity criteria, they will be transferred to the decomposer and calciner circuit for HPA production.

Once production and purity criteria are met in all three circuits, the plant will switch over to semi-continuous operation mode and ramp-up to nameplate capacity will commence, Orbite advised.

"We are entering a very exciting phase in our evolution as a company and we would like to thank our employees and contractors for their sustained and concentrated efforts over the last months,” stated Orbite CEO Glenn Kelly.

Edited by Samantha Herbst
Creamer Media Deputy Editor

Comments

The content you are trying to access is only available to subscribers.

If you are already a subscriber, you can Login Here.

If you are not a subscriber, you can subscribe now, by selecting one of the below options.

For more information or assistance, please contact us at subscriptions@creamermedia.co.za.

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION