New Brunswick to help Arianne fund study for phosphoric acid plant
The province of New Brunswick has partnered with Arianne Phosphate –the developer of the Lac à Paul project in Quebec's Saguenay-Lac-Saint-Jean region – to study the feasibility of building a phosphoric acid plant in Belledune, the development-stage phosphate mining company announced this week.
Through Opportunities New Brunswick, the province will provide a financial contribution towards the cost of a prefeasibility study – the next step in Arianne's assessment of its downstream opportunity.
"Over the last year, Arianne has been reviewing the possibility of vertically integrating its own phosphate rock production into a facility to produce phosphoric acid," said Arianne CEO Brian Ostroff.
"Our work to date has been positive and, especially with the industry now recovering from a five-year slump, it makes sense to move the idea to the next step, a prefeasibility study. We are in an enviable position. By having our own phosphate rock, we have the flexibility of either being a seller of our rock to those who need it or, going downstream and capturing that additional margin ourselves."
After the review of several locations Arianne believes that Belledune, in New Brunswick, would be a strong location to construct a plant. Most of the crucial infrastructure is already in place, namely a port that has the additional capacity to handle our operation, access to a skilled labour force, easy-access to some of the other necessary ingredients beyond Arianne's phosphate rock and, a strong willingness of would-be stakeholders to see this project advance.
Arianne has already been working with the various groups that will be involved in the study, many of them local to New Brunswick. Once finalised, the prefeasibility study is expected to take about five months.
Comments
The
content
you are trying to access is only available to subscribers.
If you are already a subscriber, you can Login Here.
If you are not a subscriber, you can subscribe now, by selecting one of the below options.
For more information or assistance, please contact us at subscriptions@creamermedia.co.za.
Option 1 (equivalent of R125 a month):
Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format
Option 2 (equivalent of R375 a month):
All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors
including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.
Already a subscriber?
Forgotten your password?
Receive weekly copy of Creamer Media's Engineering News & Mining Weekly magazine (print copy for those in South Africa and e-magazine for those outside of South Africa)
➕
Recieve daily email newsletters
➕
Access to full search results
➕
Access archive of magazine back copies
➕
Access to Projects in Progress
➕
Access to ONE Research Report of your choice in PDF format
RESEARCH CHANNEL AFRICA
R4500 (equivalent of R375 a month)
SUBSCRIBEAll benefits from Option 1
➕
Access to Creamer Media's Research Channel Africa for ALL Research Reports on various industrial and mining sectors, in PDF format, including on:
Electricity
➕
Water
➕
Energy Transition
➕
Hydrogen
➕
Roads, Rail and Ports
➕
Coal
➕
Gold
➕
Platinum
➕
Battery Metals
➕
etc.
Receive all benefits from Option 1 or Option 2 delivered to numerous people at your company
➕
Multiple User names and Passwords for simultaneous log-ins
➕
Intranet integration access to all in your organisation