https://www.miningweekly.com

Mixed bag for December mining production, sales

13th February 2024

By: Tasneem Bulbulia

Senior Contributing Editor Online

     

Font size: - +

Mining production increased by 0.6% year-on-year in December, driven by platinum group metals (PGMs) and coal, Statistics South Africa principal survey statistician Juan-Pierre Terblanche outlines.

PGMs production increased by 9.4% and contributed 2.8 percentage points, while coal production increased by 5.8%, contributing 1.3 percentage points.

Chromium output also increased, by 19.9% and contributed 0.7 of a percentage point.

However, total mining production was 0.4% lower in 2023 compared with 2022.

The 0.4% decrease in yearly mining production followed a decrease of 7.2% in 2022 and an increase of 12.7% in 2021.

Seasonally adjusted mining production decreased by 4.2% in December compared with November.

This followed month-on-month changes of 2.7% in November and 2% in October.

Seasonally adjusted mining production increased by 2.5% in the fourth quarter of 2023 compared with the third quarter of 2023.

The largest positive contributors were PGMs (8.2% and contributing 2.1 percentage points); and coal (5.3% and contributing 1.3 percentage points).

MINERAL SALES
Mineral sales at current prices, meanwhile, increased by 9.2% year-on-year in December.

The largest positive contributors were gold (127.7% and contributing 11.3 percentage points), iron-ore (60.6% and contributing 6.4 percentage points) and chromium ore (71.4% and contributing 3.2 percentage points).

Total mineral sales at current prices were 10.3% lower in 2023 compared with 2022.

The 10.3% decrease in yearly mineral sales followed increases of 3.1% in 2022 and 39.8% in 2021.

Seasonally adjusted mineral sales at current prices increased by 4.2% in December, compared with November.

This followed month-on-month changes of 2.9% in November and 13.3% in October.

Mineral sales at current prices increased by 16.8% in the fourth quarter of the year compared with the third quarter. 

Edited by Chanel de Bruyn
Creamer Media Senior Deputy Editor Online

Comments

The content you are trying to access is only available to subscribers.

If you are already a subscriber, you can Login Here.

If you are not a subscriber, you can subscribe now, by selecting one of the below options.

For more information or assistance, please contact us at subscriptions@creamermedia.co.za.

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION