https://www.miningweekly.com

Munglinup to cost A$52.4m

30th May 2018

By: Esmarie Iannucci

Creamer Media Senior Deputy Editor: Australasia

     

Font size: - +

PERTH (miningweekly.com) – The Munglinup graphite project, in Western Australia, is expected to produce around 54 800 t of graphite in concentrate over a nine-year mine life, ASX-listed Mineral Commodities reported.

A prefeasibility study (PFS) has shown that the project would require a capital expenditure of A$52.4-million to achieve the 400 000 t/y operation, with the project estimated to have a post-tax net present value of A$139-million and an internal rate of return of 48%.

The PFS estimated that the project would have average annual earnings before interest, taxes, depreciation and amortisation of A$42.2-million and net cash flows of A$216.5-million.

“The Munglinup graphite project continues to meet expectations as studies progress through the various stages thanks to many positive aspects of the project, particularly the deposit’s excellent grades,” said Mineral Commodities executive chairperson, Mark Caruso.

“The PFS demonstrates that the project is robust and economically justifiable even at very low pricing scenarios, and without the requirement for downstream value-add processing that many other projects require to get acceptable economic returns.”

The project would involve the development of several small openpits with a flotation plant to concentrate graphite ores. The majority of the ore will come from the Halberts Main pit and supplemental feed from four satellite pits.

The Munglinup project is located within a granted mining lease, and Caruso noted that the environmental and social permitting process was well under way.

Edited by Creamer Media Reporter

Comments

The content you are trying to access is only available to subscribers.

If you are already a subscriber, you can Login Here.

If you are not a subscriber, you can subscribe now, by selecting one of the below options.

For more information or assistance, please contact us at subscriptions@creamermedia.co.za.

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION