https://www.miningweekly.com

IFR JV hits Tecolutla TEC-10 target in Mexico

7th May 2018

By: Henry Lazenby

Creamer Media Deputy Editor: North America

     

Font size: - +

VANCOUVER (miningweekly.com) – Calgary-based oil and gas explorer International Frontier Resources (IFR) announced on Monday that its joint venture Tonalli Energia has reached the intended depth for its first evaluation well on its onshore Tecolutla block TEC-10 well.

In partnership with Mexican petrochemical leader Grupo IDESA, Tonalli has completed drilling of the first hole to a target depth of 2 453 m total vertical depth (TVD), and the production casing has now been successfully installed and the drilling rig was released on Friday, the company reported on Monday.

According to IFR, the TEC-10 well encountered the top of the El Abra reef at 2 315 m TVD and drilled 138 m of gross reef thickness. Wireline logs indicate 57 m of the penetrated El Abra reef has more than 3% porosity, with an average porosity of 5.7%.

There are multiple prospective intervals including a primary target interval in the upper El Abra with 13 m of net reservoir, with a porosity range of 6% to 18%, for average porosity of 10.7%.

IFR reported that Tonalli is encouraged by the high porosity identified in the TEC-10 wireline logs, and a visual inspection of the core taken from within this primary target interval has visible porosity and oil staining.

Three intervals in the lower El Abra had indications of oil while drilling and porosity values indicated on wireline logs of between 3% and 6%. The lowest identified interval is at 2 408 m TVD, which is 70 m below the lowest produced interval at Tecolutla. It is encouraging to encounter oil indications deeper than originally expected in the El Abra reef, the company stated.

IFR expects that the TEC-10 well will be completed and tested by mid-May, which will determine production rates and recovered fluid properties, IFR advised.

Edited by Creamer Media Reporter

Comments

The content you are trying to access is only available to subscribers.

If you are already a subscriber, you can Login Here.

If you are not a subscriber, you can subscribe now, by selecting one of the below options.

For more information or assistance, please contact us at subscriptions@creamermedia.co.za.

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION