https://www.miningweekly.com

Hot Chili and PLL to study bulk port facility

15th March 2024

By: Creamer Media Reporter

     

Font size: - +

Dual-listed Hot Chili has executed a memorandum of understanding (MoU) with Puerto Las Losas (PLL) to evaluate bulk tonnage loading alternatives for copper concentrates from the Costa Fuego copper/gold project, in Chile.

The MoU with PLL provides Hot Chili the right, for up to five years, to negotiate a binding port services agreement for the project.

The agreement would include a ‘take-or-pay’ volume clause, based on at least 80% of Costa Fuego’s projected future yearly concentrate production.

Under the agreement, Hot Chili and PLL will undertake a port feasibility study. Hot Chili will fund 20% of this study, which is estimated to cost $4.6-million and take about two years to complete.

Upon completion of the port feasibility study, and provided that a shipping solution for loading copper concentrates is agreed at existing or potential infrastructure in PLL, Hot Chili will have a right of first refusal to ship copper concentrates through PLL's facilities in Huasco Bay for a three-year period. 

 

Edited by Creamer Media Reporter

Comments

The content you are trying to access is only available to subscribers.

If you are already a subscriber, you can Login Here.

If you are not a subscriber, you can subscribe now, by selecting one of the below options.

For more information or assistance, please contact us at subscriptions@creamermedia.co.za.

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION