https://www.miningweekly.com

Guyana Goldfields rises on updated Aurora feasibility study

3rd February 2017

By: Henry Lazenby

Creamer Media Deputy Editor: North America

     

Font size: - +

VANCOUVER (miningweekly.com) – Guyana-focused gold producer Guyana Goldfields has published the positive results of an updated feasibility study on its cornerstone Aurora mine.

The study outlined the expansion of the current processing facility from 5 600 t/d to 8 000 t/d and pushed reserves 15% higher, net of depletion of 15 months of operation.

Based on an assumed gold price of $1 200/oz, mineral reserves increased to 3.5-million ounces and the study calculated an after-tax net present value, at a 5% discount rate, of $850-million, up from the previous estimate of $568-million on a base-case price assumption of $1 000/oz.

The proposed expansion of the mill will be completed in two phases and will increase yearly output to more than 200 000 oz starting in 2018, for the 15-year life of the mine, with gold output expected to peak at 303 000 oz in 2021.

Under the proposed mine plan, openpit mining will continue from 2017 to 2024, after which underground operations will account for output until 2031. Of the total 3.3-million ounces to be recovered over the life of the mine, 1.7-million ounces will be sourced from the openpit operations and 1.6-million ounces from the underground operations.

The operation is expected to have life-of-mine all-in sustaining costs of $747/oz.

Aurora is forecast to produce 171 000 oz this year, growing to 254 000 oz in 2018.

Guyana Goldfield’s TSX-listed stock on Thursday gained more than 5% to C$6.74 apiece.

Edited by Chanel de Bruyn
Creamer Media Senior Deputy Editor Online

Comments

The content you are trying to access is only available to subscribers.

If you are already a subscriber, you can Login Here.

If you are not a subscriber, you can subscribe now, by selecting one of the below options.

For more information or assistance, please contact us at subscriptions@creamermedia.co.za.

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION