Centerra reports production results, sets guidance for 2019
Midtier miner Centerra Gold produced 729 556 oz of gold in 2018, a 7% decrease from that of 2017, but above the company’s guidance of 665 000 oz to 705 000 oz for the year.
Centerra, which operates the water-constrained Mt Milligan mine, in British Columbia, and the Kumtor mine, in Kyrgyzstan, produced 288 367 oz of gold in the fourth quarter of 2018.
The Mt Milligan mine also produced 11.8-million pounds of copper in the fourth quarter, taking full-year copper output to 47.1-million pounds, which is at the upper-end of the 40-million-pounds to 47-million-pounds guidance.
CEO Scott Perry commented in a news release on Tuesday that both Mt Milligan and Kumtor performed well during the fourth quarter, which led to the company exceeding its production guidance.
“At Mount Milligan there were sufficient water resources in the fourth quarter to enable us to run the mill processing facility at a higher than anticipated throughput rate allowing the operation to achieve the upper end (195 000 oz) of its gold production guidance and the upper-end (47-million pounds) of its copper guidance,” said Perry.
Kumtor had a strong fourth quarter and another solid year delivering more than 534 000 oz of gold production, which exceeded the upper end of the company’s gold production guidance.
For 2019, Centerra is estimating consolidated gold production to be in the range of 690 000 oz to 740 000 oz and 65-million to 75-million pounds of payable copper production from Mount Milligan.
Perry explained that the guidance assumed reduced mill throughput for the first quarter of 2019 at Mount Milligan to properly manage its water balance until the spring melt runoff.
Centerra’s projected consolidated all-in sustaining cost per ounce sold net of copper by-product for 2019 is expected to be in the range of $723/oz to $775/oz.
Meanwhile, the miner said that the strategic agreement with the Kyrgyz government would close in the first quarter of the year. The first longstop date – the date by which all conditions precedent to the completion of the strategic requirement are required to be satisfied – has been pushed out several times.
The agreement between the parties ended a long-standing legal battle over the Kumtor mine.
Comments
The
content
you are trying to access is only available to subscribers.
If you are already a subscriber, you can Login Here.
If you are not a subscriber, you can subscribe now, by selecting one of the below options.
For more information or assistance, please contact us at subscriptions@creamermedia.co.za.
Option 1 (equivalent of R125 a month):
Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format
Option 2 (equivalent of R375 a month):
All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors
including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.
Already a subscriber?
Forgotten your password?
Receive weekly copy of Creamer Media's Engineering News & Mining Weekly magazine (print copy for those in South Africa and e-magazine for those outside of South Africa)
➕
Recieve daily email newsletters
➕
Access to full search results
➕
Access archive of magazine back copies
➕
Access to Projects in Progress
➕
Access to ONE Research Report of your choice in PDF format
RESEARCH CHANNEL AFRICA
R4500 (equivalent of R375 a month)
SUBSCRIBEAll benefits from Option 1
➕
Access to Creamer Media's Research Channel Africa for ALL Research Reports on various industrial and mining sectors, in PDF format, including on:
Electricity
➕
Water
➕
Energy Transition
➕
Hydrogen
➕
Roads, Rail and Ports
➕
Coal
➕
Gold
➕
Platinum
➕
Battery Metals
➕
etc.
Receive all benefits from Option 1 or Option 2 delivered to numerous people at your company
➕
Multiple User names and Passwords for simultaneous log-ins
➕
Intranet integration access to all in your organisation