https://www.miningweekly.com

Altura finds another $15m for lithium project

11th September 2018

By: Esmarie Iannucci

Creamer Media Senior Deputy Editor: Australasia

     

Font size: - +

PERTH (miningweekly.com) – Lithium developer Altura Mining has secured an additional $15-million for its lithium project in the Pilbara, following an amendment deed with its existing loan note holders.

“The additional funds will ensure the efficient ramp-up of commissioning towards nameplate capacity at the Altura lithium project, continued exploration of the company’s portfolio of tenements and ongoing work on the Stage 2 expansion, which targets a doubling of production to 440 000 t/y in the first half of 2020,” said Altura MD James Brown.

Altura in July produced its first spodumene from the mine, which will produce some 220 000 t/y of 6% lithium concentrate when in full production. Spodumene concentrate from the mine will be stockpiled in a purpose-built storage facility in Port Hedland, which has a capacity of 40 000 t, with Altura presently having the rights to 30 000 t.

The terms of the amendment deed are in line with the existing $110-million senior secured loan note facility that was executed in July last year, and was raised without the issue of further equity securities, which Brown said would have resulted in some dilution for existing shareholders.

Edited by Creamer Media Reporter

Comments

The content you are trying to access is only available to subscribers.

If you are already a subscriber, you can Login Here.

If you are not a subscriber, you can subscribe now, by selecting one of the below options.

For more information or assistance, please contact us at subscriptions@creamermedia.co.za.

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION