2 000-m-deep shaft project well under way, says drilling company
The initial phase of shaft sinking and drilling company Redpath Mining South Africa’s infrastructure development at Zambia-based copper and cobalt producer Mopani Copper Mines’ (MCM’s) Mindola deep shaft is currently under way, says Redpath Mining South Africa MD Ockert Douglas.
The 2000-m-deep shaft, which will be used to access deeper parts of the copper ore, comprises four 6.1-m-diameter holes at 500 m intervals, with designated areas at each interval for the placement of the drilling machine.
The company is using its proprietary Redbore 90 Raisebore machine – which is the second- largest of the company’s product offering – for the drill shaft, which will have an extended height of 5.56 m and a retracted height of 4.2 m. The unit weighs about 34.75 t, without the base plates, pipe loader or erector.
The raised Redbore drill uses a hydraulic cylinder thrust system, which has a maximum pilot hole force of 667.2 kN and a maximum reaming force of 8896.4 kN. The thrust system also has an operating pressure of up to 310.26 bar.
Douglas tells Mining Weekly that Redpath will use directional drilling to ensure that the holes are aligned from one level to the next.
Further, the company is undertaking horizontal and decline development of about 9 km to establish the required infrastructure for the new shaft and associated access development to reef horizons.
Douglas highlights that there are only three Redbore 90 machines in the global Redpath fleet; the other two machines are being used on mining projects in Australia and Canada.
Meanwhile, despite the recent economic downturn and ongoing strike action in the local mining industry, and notwithstanding the volatile copper price, the Mindola project has not been significantly affected, as proper budget planning was undertaken prior to the start of the project, says Douglas.
He describes the project as an “excellent opportunity” for Redpath Mining South Africa, as it places the company in a very strong position for the next three years.
Douglas highlights that the project employs about 400 people, 10% of which comprises foreign labour. There are 76 Redpath personnel on site, equally comprised of South African expatriates and members of the local Copperbelt community.
Further, Redpath Mining South Africa last year established an on-site training centre in Johannesburg to train local workers for job-specific tasks before they start work underground. Training takes between three weeks and three months, depending on the skills level and qualification of the workers.
Comments
The
content
you are trying to access is only available to subscribers.
If you are already a subscriber, you can Login Here.
If you are not a subscriber, you can subscribe now, by selecting one of the below options.
For more information or assistance, please contact us at subscriptions@creamermedia.co.za.
Option 1 (equivalent of R125 a month):
Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format
Option 2 (equivalent of R375 a month):
All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors
including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.
Already a subscriber?
Forgotten your password?
Receive weekly copy of Creamer Media's Engineering News & Mining Weekly magazine (print copy for those in South Africa and e-magazine for those outside of South Africa)
➕
Recieve daily email newsletters
➕
Access to full search results
➕
Access archive of magazine back copies
➕
Access to Projects in Progress
➕
Access to ONE Research Report of your choice in PDF format
RESEARCH CHANNEL AFRICA
R4500 (equivalent of R375 a month)
SUBSCRIBEAll benefits from Option 1
➕
Access to Creamer Media's Research Channel Africa for ALL Research Reports on various industrial and mining sectors, in PDF format, including on:
Electricity
➕
Water
➕
Energy Transition
➕
Hydrogen
➕
Roads, Rail and Ports
➕
Coal
➕
Gold
➕
Platinum
➕
Battery Metals
➕
etc.
Receive all benefits from Option 1 or Option 2 delivered to numerous people at your company
➕
Multiple User names and Passwords for simultaneous log-ins
➕
Intranet integration access to all in your organisation