GOLD 1566.55 $/ozChange: 0.90
PLATINUM 1425.50 $/ozChange: 2.00
R/$ exchange 8.38Change: 0.02
R/€ exchange 10.49Change: 0.06
 
We have detected that the browser you are using is no longer supported. As a result, some content may not display correctly.
We suggest that you upgrade to the latest version of any of the following browsers:
         
close notification
powered by
Advanced Search
 
 
 
Home
 
Most Popular Articles - Americas
 
 
GOLD
Yamana Gold begins production at Mexico mine
 
18th November 2011
TEXT SIZE
Text Smaller Disabled Text Bigger
 

Yamana Gold said it has started production at its Mercedes mine in Mexico and it expects to start commercial production in the second quarter of 2012.

The Toronto-based company, which owns projects in Chile, Argentina, Brazil and Mexico, said it expects a production rate of about 1 500 tonnes of ore per day at the Mercedes mine.

In August Yamana said it expects 2011 output of 1.04-million to 1.14-million gold equivalent ounces, but warned of a rise in capital expenditure over the next three years.

Yamana on Friday said it expects initial production of 120 000 gold equivalent ounces per year from the new mine.

The company said it has stockpiled 114 000 tonnes of ore, with an average grade of 7.84 grams per tonne (g/t) of gold and 114.9 g/t of silver.

Shares of Yamana closed at C$15.94 on Thursday on the Toronto Stock Exchange.

Edited by: Reuters

To subscribe to Mining Weekly's print magazine email subscriptions@creamermedia.co.za or buy now.

Subscribe Now Login