Xtract Resources disappointed over poor first-quarter gold output
Total alluvial mining contractor gold production was 467 oz at the Manica concession for the first quarter, ended March 31, 2020, diversified metals and minerals producer Xtract Resources reports, noting that the results “are a little bit disappointing for the first quarter”.
This compares with the 1 045 oz produced in the fourth quarter of 2019, ended December 31.
The Manica concession is in Mozambique.
Executive chairperson Colin Bird says the results were affected by the rainy season, as well as the effect of the Covid-19 pandemic on spare parts delivery from China.
The spare parts from China arrived two weeks ago, and operations are already showing a significant improvement, Bird says.
The company, however, expects that it will continue to experience low grades and high overburden stripping.
Meanwhile, over the course of the next month, the company intends to start a further contract with another Chinese group on an adjacent licence, where the agreement with the group will be similar to the existing agreements already in place.
“We are actively engaging with another group on working the Guy Fawkes and Boa Esperenca small hard rock deposits,” Bird notes.
These deposits have indicated free milling gold at good grades, according to Xtract, and preparations are under way to ship major components for the Fairbride gold project, once border restrictions are lifted, which is expected in middle to late June.
The equipment will be accompanied by the necessary lifting equipment for installation.
Comments
Press Office
Announcements
What's On
Subscribe to improve your user experience...
Option 1 (equivalent of R125 a month):
Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format
Option 2 (equivalent of R375 a month):
All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors
including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.
Already a subscriber?
Forgotten your password?
Receive weekly copy of Creamer Media's Engineering News & Mining Weekly magazine (print copy for those in South Africa and e-magazine for those outside of South Africa)
➕
Recieve daily email newsletters
➕
Access to full search results
➕
Access archive of magazine back copies
➕
Access to Projects in Progress
➕
Access to ONE Research Report of your choice in PDF format
RESEARCH CHANNEL AFRICA
R4500 (equivalent of R375 a month)
SUBSCRIBEAll benefits from Option 1
➕
Access to Creamer Media's Research Channel Africa for ALL Research Reports on various industrial and mining sectors, in PDF format, including on:
Electricity
➕
Water
➕
Energy Transition
➕
Hydrogen
➕
Roads, Rail and Ports
➕
Coal
➕
Gold
➕
Platinum
➕
Battery Metals
➕
etc.
Receive all benefits from Option 1 or Option 2 delivered to numerous people at your company
➕
Multiple User names and Passwords for simultaneous log-ins
➕
Intranet integration access to all in your organisation