Woxna graphite anode project, Sweden
Name of the Project
Woxna graphite anode project.
Location
Gävleborg County, Sweden.
Project Owner/s
Leading Edge Minerals.
Project Description
A preliminary economic assessment (PEA) has indicated the potential viability of an operation producing battery-grade graphite anode material using an existing graphite mine and concentrator, with the addition of a value-add processing facility off site.
The project has measured and indicated resources of 10.77-million tonnes grading 7.75% carbon. Inferred resources are estimated at 2.51-million tonnes grading 8.16%.
Conventional openpit drill-and-blast, combined with trucks and shovel mining methods have been selected to be operated by a local specialist mining contractor, to maximise the operational efficiency, provide flexibility, and potentially lower investment risk to the project.
The proposed process route in the PEA uses a thermal purification process, which combined with access to low-cost hydropower, offers a low carbon footprint for the project.
The project will also feature an improved waste management process for tailings, further improving the sustainability ambitions of the project.
The project has a life-of-mine (LoM) of 15 years and will produce about 258 000 t of contained graphite in concentrate.
LoM average plant feed is expected at 159 967 t/y; coated spherical purified graphite at 7 435 t/y and micronised graphite product at 8 421 t/y.
Potential Job Creation
Not stated.
Net Present Value/Internal Rate of Return
The project has a pretax net present value, at an 8% discount rate, of $317-million and an internal rate of return of 42.9%, with a payback of 2.24 years.
Capital Expenditure
Initial capital expenditure is estimated at $121-million.
Planned Start/End Date
Not stated.
Latest Developments
None stated.
Key Contracts, Suppliers and Consultants
Zenito (preliminary economic assessment).
Contact Details for Project Information
Leading Edge Minerals, tel +1604245 5932 or email info@leadingedgematerials.com.
Comments
Press Office
Announcements
What's On
Subscribe to improve your user experience...
Option 1 (equivalent of R125 a month):
Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format
Option 2 (equivalent of R375 a month):
All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors
including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.
Already a subscriber?
Forgotten your password?
Receive weekly copy of Creamer Media's Engineering News & Mining Weekly magazine (print copy for those in South Africa and e-magazine for those outside of South Africa)
➕
Recieve daily email newsletters
➕
Access to full search results
➕
Access archive of magazine back copies
➕
Access to Projects in Progress
➕
Access to ONE Research Report of your choice in PDF format
RESEARCH CHANNEL AFRICA
R4500 (equivalent of R375 a month)
SUBSCRIBEAll benefits from Option 1
➕
Access to Creamer Media's Research Channel Africa for ALL Research Reports on various industrial and mining sectors, in PDF format, including on:
Electricity
➕
Water
➕
Energy Transition
➕
Hydrogen
➕
Roads, Rail and Ports
➕
Coal
➕
Gold
➕
Platinum
➕
Battery Metals
➕
etc.
Receive all benefits from Option 1 or Option 2 delivered to numerous people at your company
➕
Multiple User names and Passwords for simultaneous log-ins
➕
Intranet integration access to all in your organisation