https://www.miningweekly.com
Africa|Consulting|Gold|Infrastructure|Mining|PROJECT|Resources|Storage|Underground|Infrastructure
Africa|Consulting|Gold|Infrastructure|Mining|PROJECT|Resources|Storage|Underground|Infrastructure
africa|consulting-company|gold|infrastructure|mining|project|resources|storage|underground|infrastructure

Witwatersrand basin project – Qala Shallows Phase 1, South Africa – update

Map of Witwatersrand Basin Project's mining tenements

Photo by West Wits Mining

14th April 2023

By: Sheila Barradas

Creamer Media Research Coordinator & Senior Deputy Editor

     

Font size: - +

Name of the Project
Witwatersrand basin project (WBP) – Qala Shallows Phase 1.

Location
At the northern edge of the Witwatersrand basin, in the Central Rand Goldfield, immediately south-west of the City of Johannesburg, in Gauteng, South Africa.

Project Owner/s
West Wits Mining.

Project Description
The Qala Shallows Phase 1 project forms part of West Wits’ WBP and covers a 60% subsection of the WBP scoping study.

Phase 1 has a declared ore reserve of 3.2-million tonnes grading 2.81 g/t, and total mineral resources estimated at 29.05-million tonnes grading 4.58 g/t gold.

Total production is estimated at 680 000 oz of gold over a 16-year life-of-mine (LoM).

Steady-state production is estimated at 55 000 oz/y for ten years.

Phase 2, or Project 200, aims to substantially increase production to 200 000 oz/y of gold. A scoping study is scheduled for 2023 to determine additional infrastructure capital expenditure. Additional infrastructure includes process and tailings storage facilities, shafts and access points.

Potential Job Creation
Not stated.

Net Present Value/Internal Rate of Return
The project has a pretax net present value, at a 7.5% discount rate, of $180-million and an internal rate of return of 38%, with a payback of five years.

Capital Expenditure
Peak funding is estimated at  $63-million.

Planned Start/End Date
Phase 1 is expected to be completed in 2026.

Latest Developments
West Wits reported in March that critical infrastructure, and decline and boxcut rehabilitation, had been completed.

On-reef underground access is advancing.

Key Contracts and Suppliers
Modi Mining (mining contract); and Bara Consulting (LoM production profile).

Contact Details for Project Information
West Wits Mining, tel +61 3 8692 9049 or email info@westwitsmining.com.

Edited by Creamer Media Reporter

Comments

Latest News

Showroom

Schauenburg SmartMine IoT
Schauenburg SmartMine IoT

SmartMine IoT has been developed with the mining industry in mind, to provides our customers with powerful business intelligence and data modelling...

VISIT SHOWROOM 
Weir Minerals Africa and Middle East
Weir Minerals Africa and Middle East

Weir Minerals Europe, Middle East and Africa is a global supplier of excellent minerals solutions, including pumps, valves, hydrocyclones,...

VISIT SHOWROOM 

Latest Multimedia

sponsored by

Photo of Martin Creamer
On-The-Air (26/04/2024)
26th April 2024 By: Martin Creamer
Mining Weekly Editor Martin Creamer
Copper shares soar and green hydrogen goes digital
26th April 2024
Magazine cover image
Magazine round up | 26 April 2024
26th April 2024

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION







sq:0.229 0.295s - 92pq - 2rq
1:
1: United States
Subscribe Now
2: United States
2: