https://www.miningweekly.com
Construction|Contractor|Copper|Design|Electrical|Engineering|Gold|Instrumentation|Mineral Processing|PROJECT|Project Management|Projects|Services|Operations
Construction|Contractor|Copper|Design|Electrical|Engineering|Gold|Instrumentation|Mineral Processing|PROJECT|Project Management|Projects|Services|Operations
construction|contractor|copper|design|electrical|engineering|gold|instrumentation|mineral-processing|project|project-management|projects|services|operations

West Musgrave base metals project, Australia – update

Image of a drill rig at the West Musgrave project

Photo by OZ Minerals

12th May 2023

By: Sheila Barradas

Creamer Media Research Coordinator & Senior Deputy Editor

     

Font size: - +

Name of the Project
West Musgrave base metals project.

Location
West Musgrave Ranges of Western Australia.

Project Owner/s
Copper/gold miner OZ Minerals, a subsidiary of BHP.

Project Description
The West Musgrave includes the Nebo-Babel nickel/copper and Succoth copper deposits and is considered to be one of the world’s biggest, lowest-cost and lowest-emissions copper/nickel projects.

The processing capacity has increased from 12-million tonnes in the December 2020 updated prefeasibility study (PFS) to 13.5-million tonnes in the 2022 feasibility study 

The 2022 feasibility study envisages average nickel production at 35 000 t/y nickel and 41 000 t/y copper in the first five years, and 28 000 t/y nickel and 35 000 t/y copper over a 24-year life-of-mine.

Further, a mixed hydroxide precipitate (MHP) project study, completed in November 2022, confirmed the technical and commercial opportunity of producing a high-quality and high-grade MHP product, and the potential for significant value uplift, at the project.

The MHP study considers further processing nickel concentrate from the project into a high-grade nickel product through a pressure oxidation and precipitation process.

The MHP process plant will be built after the mine begins production.

Potential Job Creation
The project is expected to create about 1 500 jobs during construction and about 400 jobs in ongoing operations.

Net Present Value/Internal Rate of Return
The 2022 feasibility study estimates a net present value of between $1.5-billion and $2.2-billion on capital of $1.7-billion, and an internal rate of return of between 18% and 22%, with project payback estimated at 6.5 to 7.5 years.

Capital Expenditure
$1.7-billion.

Planned Start/End Date
First concentrate is targeted for the second half of 2025.

Latest Developments
Contractor GR Engineering Services has been awarded two contracts worth a combined A$312-million.

Under the contracts, GR Engineering will be responsible for the engineering design, project management and commissioning of the West Musgrave mineral processing plant, as well as the structural, mechanical, piping, electrical and instrumentation construction works at the project.

Key Contracts, Suppliers and Consultants
GR Engineering (engineering design, project management and commissioning).

Contact Details for Project Information
OZ Minerals, tel +61 8 8229 6600 or email info@ozminerals.com.

Edited by Creamer Media Reporter

Comments

Latest News

American Rare Earths’ Wyoming project sparks SPAC interest
American Rare Earths’ Wyoming project sparks SPAC interest
Updated 1 hour 31 minutes ago By: Mariaan Webb

Showroom

Yale Lifting Solutions
Yale Lifting Solutions

Yale Lifting Solutions is a leading supplier of lifting and material handling equipment in Southern Africa. Yale offers a wide range of quality...

VISIT SHOWROOM 
Schauenburg SmartMine IoT
Schauenburg SmartMine IoT

SmartMine IoT has been developed with the mining industry in mind, to provides our customers with powerful business intelligence and data modelling...

VISIT SHOWROOM 

Latest Multimedia

sponsored by

Mining Weekly Editor Martin Creamer
Copper shares soar and green hydrogen goes digital
26th April 2024
Magazine cover image
Magazine round up | 26 April 2024
26th April 2024

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION







sq:5.87 5.958s - 92pq - 2rq
1:
1: United States
Subscribe Now
2: United States
2: