https://www.miningweekly.com
Automotive|Mining|PROJECT|Resources|Solutions
Automotive|Mining|PROJECT|Resources|Solutions
automotive|mining|project|resources|solutions

Vittangi battery anode project, Sweden – update

Image of graphite ore

8th December 2023

By: Sheila Barradas

Creamer Media Research Coordinator & Senior Deputy Editor

     

Font size: - +

Name of the Project
Vittangi battery anode project.

Location
Northern Sweden.

Project Owner/s
Battery anode and advanced materials company Talga Group.

Project Description
A detailed feasibility study (DFS) has confirmed the project’s potential to supply globally competitive green graphite anode, suitable for multiple applications, including Tier 1 automotive lithium-ion batteries.

The DFS envisages a vertically integrated mine-to-anode operation producing 19 500 t/y battery anode Talnode-C from 100 000 t/y of Vittangi graphite ore over a 24-year mine life. Vittangi will use 100% renewable electricity to produce the initial 19 500 t/y of green anode.

A scoping study was also completed during the DFS to evaluate the potential addition of about 85 000 t/y Talnode-C production from the adjacent Niska resources. This study identified significant commercial synergies to unify deposit development and production plans to maximise the potential of the project area. This will be subject to separate studies following further discussions with customers and development partners.

Potential Job Creation
Not stated.

Net Present Value/Internal Rate of Return
The project has a pretax net present value, at an 8% discount rate, of $1.05-billion and an internal rate of return of 30%, with a payback of 2.5 years after the project is commissioned.

Capital Expenditure
$484-million, and a $44-million contingency.

Planned Start/End Date
Mining is planned to start in 2023, with commercial anode production expected in 2024.

Latest Developments
Talga has completed its share purchase plan, raising A$19-million for the development of its Vittangi project.

The plan targeted A$15-million and closed oversubscribed. Talga will use the proceeds to progress critical-path development activities.

Key Contracts, Suppliers and Consultants
Worley (lead consultant – DFS); and ABB (delivery of production and process control solutions).

Contact Details for Project Information
Talga Group, tel +61 8 9481 6667 or email info@talgagroup.com.

To watch Creamer Media's latest video reports, click here
 

Edited by Creamer Media Reporter

Comments

Showroom

Rio-Carb
Rio-Carb

Our Easy Access Chute concept was developed to reduce the risks related to liner maintenance. Currently, replacing wear liners require that...

VISIT SHOWROOM 
Booyco Electronics
Booyco Electronics

Booyco Electronics, South African pioneer of Proximity Detection Systems, offers safety solutions for underground and surface mining, quarrying,...

VISIT SHOWROOM 

Latest Multimedia

sponsored by

Magazine round up | 03 May 2024
Magazine round up | 03 May 2024
3rd May 2024

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION







sq:0.197 0.251s - 92pq - 2rq
1:
1: United States
Subscribe Now
2: United States
2: