Name of the Project
Vanadium recovery project.

Location
Tahkoluoto port, in Pori, Finland.

Project Owner/s
Project developer Neometals and Critical Metals.

Project Description
Neometals and Critical Metals are jointly evaluating the feasibility of building a facility to process and recover high-grade vanadium chemicals from vanadium-bearing steelmaking by-products generated by Scandinavian companies SSAB EMEA and SSAB Europe Oy, collectively SSAB.

The project will be capable of processing 200 000 t/y of slag, with a reference grade of 3.93% vanadium pentoxide, without having to build a mine and concentrator, which existing primary producers have done.

The prefeasibility study envisages production of 13.43-million pounds of vanadium pentoxide over a 10.5-year life-of-plant.

The slag supply agreement provides for the conditional purchase of at least two-million dry metric tonnes of slag from SSAB.

Potential Job Creation
Not stated.

Net Present Value/Internal Rate of Return
The project has a net present value, at a 10% discount rate, of $230.1-million and an internal rate of return of 31% on a 100% ownership basis, with a payback of about four years.

Capital Expenditure
Initial capital costs are estimated at $183-million.

Planned Start/End Date
Operations are expected to start in December 2024.

Latest Developments
The pilot plant is under construction with commissioning targeted for June 2021.

A definitive feasibility study (DFS) is on schedule for July 2021 to allow for a potential final investment decision in the second half of 2022.

As part of the DFS, Primobius will conduct a comprehensive economic analysis after the completion of the demonstration plant and engineering cost, and report the results of the DFS.

The economic case for consideration in a final investment decision to build Primobius’ first plant will ultimately be based on a feedstock blend consistent with future commercial feed supply and/or disposal service agreements.

Key Contracts, Suppliers and Consultants
Hatch (prefeasibility study).

Contact Details for Project Information
Neometals, tel +61 8 9322 1182 or email info@neometals.com.au.

Edited by Creamer Media Reporter

Comments

Showroom

Schauenburg SmartMine IoT
Schauenburg SmartMine IoT

SmartMine IoT has been developed with the mining industry in mind, to provides our customers with powerful business intelligence and data modelling...

VISIT SHOWROOM 
Weir Minerals Africa and Middle East
Weir Minerals Africa and Middle East

Weir Minerals Europe, Middle East and Africa is a global supplier of excellent minerals solutions, including pumps, valves, hydrocyclones,...

VISIT SHOWROOM 

Latest Multimedia

sponsored by

Magazine round up | 10 May 2024
Magazine round up | 17 May 2024
17th May 2024

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION







sq:0.252 0.307s - 93pq - 2rq
1:
1: United States
Subscribe Now
2: United States
2: