https://www.miningweekly.com

Uranium Energy’s Paraguay project advances to exploitation phase

29th May 2015

By: Henry Lazenby

Creamer Media Deputy Editor: North America

  

Font size: - +

TORONTO (miningweekly.com) – The Yuty in situ recovery (ISR) project, one of two projects owned by US uranium producer and project developer Uranium Energy Corp (UEC) in Paraguay, is the third project to enter the exploitation phase since the country's current mining law was promulgated in 2007.

The NYSE MKT-listed company reported on Friday that the project had received a signed resolution from the Ministry of Public Works and Communication (MOPC), the national agency that regulated mining in the country.

During Yuty’s exploitation phase, comprising a maximum of 20 years and a ten-year extension, the environmental licensing process could start. This was a key milestone required before starting production and would allow for reductions in land and various investment costs. The exploitation phase would be followed by the production phase, which would last for an indefinite period.

“UEC's commitment to our two Paraguayan projects, Yuty and Oviedo, continues to strengthen,” UEC VP for exploration Clyde Yancey commented.

He said the company's technical staff in Asuncion were starting work on a comprehensive preliminary economic assessment report on Yuty in coordination with the Corpus Christi-based operating team and independent ISR engineers.

“Given the geological similarities of our Paraguayan ISR projects and our South Texas ISR projects, we anticipate a strong investment case for Yuty highlighted by a low-capital and operating-expenditure profile,” Yancey advised.

President and CEO Amir Adnani added that the company’s development of Paraguayan uranium resources, close to both Argentina and Brazil, was a significant step in advancing nuclear energy in South America.

“These two countries combined have five operating reactors, two under construction and seven more in the proposal stage. In addition, a meaningful new uranium source from a peaceful and stable jurisdiction like Paraguay is beginning to draw the attention of global utility companies,” he noted.

In Paraguay, UEC controlled one of the largest ISR property positions in the world with about 303.5 ha of prospective area. The Yuty project had a National Instrument 43-101-compliant measured and indicated resource of 8.91-million pounds, grading 0.052% uranium oxide (U3O8), and an inferred resource of 2.23-million pounds, grading 0.047% U3O8.

The company's Oviedo project had an exploration target of 23-million pounds to 56-million pounds, grading 0.040% to 0.052% U3O8. Historic exploration by the Anschutz/Taiwan Power/Korea Electric Power joint venture, Cameco/Cue Resources and recent exploration by UEC to advance these projects totalled $50-million.

Edited by Tracy Hancock
Creamer Media Contributing Editor

Comments

Latest Multimedia

Photo of Martin Creamer
On-The-Air (26/04/2024)
Updated 1 hour 48 minutes ago By: Martin Creamer

Showroom

SMS group
SMS group

At SMS group, we have made it our mission to create a carbon-neutral and sustainable metals industry.

VISIT SHOWROOM 
Werner South Africa Pumps & Equipment (PTY) LTD
Werner South Africa Pumps & Equipment (PTY) LTD

For over 30 years, Werner South Africa Pumps & Equipment (PTY) LTD has been designing, manufacturing, supplying and maintaining specialist...

VISIT SHOWROOM 

Latest Multimedia

sponsored by

Magazine cover image
Magazine round up | 26 April 2024
26th April 2024

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION







sq:0.069 0.105s - 106pq - 2rq
1:
1: United States
Subscribe Now
2: United States
2: