https://www.miningweekly.com

Tiger secures offtake partner

17th October 2013

By: Esmarie Iannucci

Creamer Media Senior Deputy Editor: Australasia

  

Font size: - +

PERTH (miningweekly.com) – Dual-listed copper miner Tiger Resources has agreed to a 100 000 t copper cathode offtake agreement from the Stage 2 development of its Kipoi project, in the Democratic Republic of Congo (DRC).

The agreement, executed with commodity trader Gerald Metals SA, was for a fixed quantity of copper cathode from the Stage 2 solvent extraction and electrowinning (SX-EW) plant, which was currently under construction and on schedule for commissioning in the second quarter of 2014.

Tiger would deliver about 2 000 t/m of cathodes during the initial phase of the SX-EW operations, increasing this to 2 500 t/m after the proposed expansion of the plant to a 50 000 t/y capacity.

Gerald had supplied a A$50-million advanced payment facility to help fund the SX-EW plant at Kipoi, which would be available for immediate drawdown after the satisfaction of customary conditions precedent, including the registration of security documents.

“We are very pleased to have arranged the $50-million advance payment against 100 000 t of Kipoi copper cathodes. Strong offers were received from eight leading international copper trading houses who participated in our tender process,” said MD Brad Marwood.

He said that the deal reflected positively on their assessment of Kipoi and its capacity to deliver copper cathodes in the DRC.

The Kipoi project delivered 12 123 t of copper in concentrate during the three months to September, which was 35% above the plant’s nameplate capacity and 9% higher than the previous quarter production record.

For the calendar year to date, the Kipoi project has delivered 32 727 t of copper in concentrate.

Edited by Creamer Media Reporter

Article Enquiry

Email Article

Save Article

Feedback

To advertise email advertising@creamermedia.co.za or click here

Latest News

This week: Mintek targeting global flotation research recognition; First doré gold bar pour at DRDGOLD’s new Far West smelt house and, Expansion plans pointing to 75% increase in Sibanye-Stillwater’s chrome volumes
Resources Watch
22nd July 2026

Showroom

Essentra Components
Essentra Components

We are responsible manufacturers of essential components. Manufacturing 80 million parts a week, we have over 1 billion parts in stock.

VISIT SHOWROOM 
Alco-Safe
Alco-Safe

Developed to exceed the latest EN 15964 standards for police breathalysers proving that it will remain accurate and reliable for many years to come.

VISIT SHOWROOM 

Latest Multimedia

sponsored by

This week: Mintek targeting global flotation research recognition; First doré gold bar pour at DRDGOLD’s new Far West smelt house and, Expansion plans pointing to 75% increase in Sibanye-Stillwater’s chrome volumes
Resources Watch
22nd July 2026

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION







sq:0.058 0.081s - 114pq - 2rq
Subscribe Now