https://www.miningweekly.com

Thalanga zinc restart project, Australia

11th August 2017

By: Creamer Media Reporter

     

Font size: - +

Name of the Project
Thalanga zinc restart project.

Location
Queensland, Australia.

Client
Red River Resources.

Project Description
Red River is studying the potential of restarting production at the 650 000 t/y Thalanga processing plant near Townsville. The plant is currently on care and maintenance.

The restart study is based on production from three deposits – West 45, Far West and Waterloo. The study envisages that Red River will sequentially mine the West 45, Far West and Waterloo deposits. The planned mine designs and schedules for West 45, Far West and Waterloo are based on industry-standard Australasian mechanised underground mining techniques.

Average production is estimated to be 21 400 t/y of zinc, 3 600 t/y of copper, 5 000 t/y of lead, 2 000 oz/y of gold and 370 000 oz/y of silver in concentrate over an initial mine life of five years.

Jobs to be Created
Not stated.

Net Present Value/Internal Rate of Return
The restart project has an estimated net present value, at an 8% (real) discount rate, of $84-million and an internal rate of return of 61%.

Value
Preproduction capital is estimated at $17.2-million.

Duration
The project has a short timeline to production of about six months. Production is set to start in the fourth quarter of 2017.

Latest Developments
Red River has finalised offtake agreements for the zinc and lead concentrate to be produced from the project. Commodity trader Trafigura has committed to take 122 000 dry metric tons of zinc concentrate and 27 400 dry metric tons of lead concentrate. Pricing will be determined at the time of shipment.

Under the terms of the offtake agreements, concentrates will be trucked about 200 km to the Port of Townsville for onward delivery to customers.

Red River reports that the project remains on budget and schedule to resume production in the fourth quarter of 2017.

Key Contracts and Suppliers
PYBAR Mining Services (underground mining contract).

On Budget and on Time?
Not stated.

Contact Details for Project Information
Red River Resources, MD Mel Palancian, tel +61 3 9095 7775 or email mpalancian@redriverresources.com.au.

Edited by Creamer Media Reporter

Comments

Projects

Image of lithium ore stockpile
Lithium conversion plant, Australia
Updated 2 hours 7 minutes ago By: Sheila Barradas
Aerial view of the Amapá mine
Amapá iron-ore project, Brazil
Updated 2 hours 7 minutes ago By: Sheila Barradas

Showroom

Multotec
Multotec

Multotec, recognised industry leaders in metallurgy and process engineering help mining houses across the world process minerals more efficiently,...

VISIT SHOWROOM 
Rentech
Rentech

Rentech provides renewable energy products and services to the local and selected African markets. Supplying inverters, lithium and lead-acid...

VISIT SHOWROOM 

Latest Multimedia

sponsored by

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION







sq:4.661 4.712s - 90pq - 2rq
1:
1: United States
Subscribe Now
2: United States
2: