Séguéla gold project, Côte d’Ivoire – update

CIL and water tanks erected at Séguéla. Thickener assembly and structural steel erection under way - October 2022

Photo by Fortuna Silver Mines

11th November 2022

By: Sheila Barradas

Creamer Media Research Coordinator & Senior Deputy Editor

     

Font size: - +

Name of the Project
Séguéla gold project.

Location
Worodougou region of the Woroba District, Côte d’Ivoire.

Project Owner/s
Fortuna Silver Mines.

Project Description
Séguéla has total mineral reserves of 12.06-million tonnes.

The project has a mine life of 8.6 years, during which it is expected to produce 1.03-million ounces of gold, with average gold production estimated at 120 000 oz/y.

The project involves the development of an openpit mining operation, targeting a series of openpit mines at the Antenna, Koula, Ancien, Agouti and Boulder deposits that will feed a central gold processing facility.

Conventional openpit mining methods will be used at Séguéla.

Drilling and blasting are planned for oxide and fresh mineralised material, followed by conventional truck-and-shovel operations in the pits for the movement of mineralised material and waste.

The processing plant will have a capacity of 1.25-million tonnes a year, increasing to 1.57-million tonnes a year in Year 3 through a series of optimisation and debottlenecking measures.

Potential Job Creation
Not stated.

Net Present Value/Internal Rate of Return
The project has an after-tax net present value, at a 5% discount rate and gold price of $1 600/oz, of $380-million and an internal rate of return of 49%, with a payback of 1.7 years.

Capital Expenditure
$173.5-million.

Planned Start/End Date
The project is expected to take 20 months to complete, with first gold expected by mid-2023.

Latest Developments
The construction of the Séguéla project is on time and within budget, despite a particularly heavy wet season, Fortuna Silver Mines COO for West Africa David Whittle has said.

The project is about 83% complete and the first gold pour remains on target for mid-2023.

Fortuna has said that deliveries continue to arrive in Abidjan, with all semiautogenous grinding (SAG) mill components now shipped. The last SAG mill package will arrive in early December.

Construction of the 90 kV transmission line and substation is nearing completion and is on track to be energised in December.

The company further reports that about 565 000 m3 of water has collected in the water storage dam, which is in line with expectations and the requirements for commissioning and startup activities.

Earthworks and high-density polyethylene lining of the tailings storage facility are on track for completion before the end of 2022.

The mining contractor has mobilised to site and has started establishment activities.

Key Contracts, Suppliers and Consultants
None stated.

Contact Details for Project Information
Fortuna Silver Mines, email info@fortunasilver.com.

Edited by Creamer Media Reporter

Comments

 

Showroom

Weir Minerals Africa and Middle East
Weir Minerals Africa and Middle East

Weir Minerals Europe, Middle East and Africa is a global supplier of excellent minerals solutions, including pumps, valves, hydrocyclones,...

VISIT SHOWROOM 
Universal Storage Systems (SA)
Universal Storage Systems (SA)

South African leader in Steel -Racking, -Shelving, and -Mezzanine flooring. Universal has innovated an approach which encompasses conceptualising,...

VISIT SHOWROOM 

Latest Multimedia

sponsored by

Magazine round up | 10 May 2024
Magazine round up | 17 May 2024
17th May 2024

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION







sq:0.237 0.29s - 93pq - 2rq
1:
1: United States
Subscribe Now
2: United States
2: