https://www.miningweekly.com
Botswana|Coal|Gas|Pipes|PROJECT|Drilling
Botswana|Coal|Gas|Pipes|PROJECT|Drilling
botswana|coal|gas|pipes|project|drilling

Serowe spuds on the horizon

31st May 2021

By: Esmarie Iannucci

Creamer Media Senior Deputy Editor: Australasia

     

Font size: - +

PERTH (miningweekly.com) – ASX-listed Pure Hydrogen Corporation and its joint venture (JV) partner BotsGas are readying to spud the first of six wells at the Serowe coal seam gas project, in Botswana.

The campaign will consist of two separate stages of three appraisal wells each, and is designed to confirm the geological model for the area, and to demonstrate the widespread uniformity of the Serowe formation, from which the JV partners are hoping to extract coalbed methane.

“Serowe is an exciting asset with good upside and the gas price in Botswana is very high at the moment. BotsGas’ team is well placed to execute the programme. They have the experience and the technical skills to unlock the value from these highly prospective leases,” said Pure Hydrogen MD Scott Brown.

The first stage 1 well is scheduled to spud in the next few days, and will be followed up by the second and third wells.

Two of the planned wells will be converted to production wells while the third is in an outlying region to test the presence of high-grade coalbed methane. The proposed drill sites have been readied for drilling and the necessary drill pipes have been delivered.

The second set of wells will be drilled later this year, after consideration has been given to the results from the first three wells.

Edited by Creamer Media Reporter

Comments

Showroom

John Thompson
John Thompson

John Thompson, the leader in energy and environmental solutions through value engineering and innovation, provides the following: design, engineer,...

VISIT SHOWROOM 
WearCheck
WearCheck

Leading condition monitoring specialists, WearCheck, help boost machinery lifespan and reduce catastrophic component failure through the scientific...

VISIT SHOWROOM 

Latest Multimedia

sponsored by

Magazine round up | 03 May 2024
Magazine round up | 03 May 2024
3rd May 2024
Resources Watch
Resources Watch
2nd May 2024

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION







sq:0.159 0.197s - 108pq - 2rq
1:
1: United States
Subscribe Now
2: United States
2: