Name of the Project
Santa Cruz underground copper mine.

Location
Arizona, in the US.

Project Owner/s
Ivanhoe Electric.

Project Description
Santa Cruz is currently not being mined.

An initial assessment and technical summary report on the project has shown a potential new source of "responsibly produced ‘green’ copper” to enhance US supply chain independence.

Mineral resources are stated for three deposits: Santa Cruz, Texaco and East Ridge. Total indicated and inferred resources are estimated at 100.24-million tonnes grading 1.63% soluble copper, 1.5% acid soluble copper and 0.41% cyanide soluble copper. For mine planning work, however, only the high-grade exotic, oxide and enriched domains of the Santa Cruz and East Ridge deposits have been evaluated.

Over the 20-year LoM, 105.2-million tonnes of mineralised material are expected to be mined. This includes 88.6-million tonnes from the Santa Cruz deposit, 1.9-million tonnes from the Santa Cruz exotic mineralisation, 9.8-million tonnes from the East Ridge deposit and 4.9-million tonnes of low-grade material required to access the deposits.

The proposed mine will target a combined production of 15 000 t/d from Santa Cruz and East Ridge.

The initial assessment includes potential LoM production of 1.59-million tonnes of copper contained in 99.99% pure cathode, and 48% copper concentrate with very low deleterious elements such as arsenic or lead. LoM copper recovered to cathode totals 1.03-million tonnes and LoM copper recovered to concentrate totals 555 000 t (65% copper in cathode, 35% copper in concentrate).

The report has determined that an underground longhole stoping method is suitable for the oxide and chalcocite-enriched domains within the Santa Cruz deposit.

The East Ridge deposit will be mined using drift-and-fill methods, with cemented waste-rock backfill for support. Future studies could evaluate the potential addition of the large primary sulphide domains at Santa Cruz (76.2-million tonnes indicated grading 0.88% total copper and 8-million tonnes inferred grading 0.92% total copper using a 0.70% cutoff grade), and at the Texaco deposit (900 000 t indicated grading 1.05% total copper and 35-million tonnes inferred grading 1.06% total copper using a 0.80% cutoff grade), subject to market conditions.

Potential Job Creation
Not stated.

Net Present Value/Internal Rate of Return
The project has a pretax net present value, at an 8% discount rate, of $1.64-billion and an internal rate of return of 25.1%.

Capital Expenditure
$1.15-billion.

Planned Start/End Date
Not stated.

Latest Developments
Not stated.

Key Contracts, Suppliers and Consultants
None stated.

Contact Details for Project Information
Ivanhoe Electric, tel +1 604 689 8765 or email info@ivanhoeelectric.com.

Edited by Martin Zhuwakinyu
Creamer Media Senior Deputy Editor

Comments

Showroom

Multotec
Multotec

Multotec, recognised industry leaders in metallurgy and process engineering help mining houses across the world process minerals more efficiently,...

VISIT SHOWROOM 
Weir Minerals Africa and Middle East
Weir Minerals Africa and Middle East

Weir Minerals Europe, Middle East and Africa is a global supplier of excellent minerals solutions, including pumps, valves, hydrocyclones,...

VISIT SHOWROOM 

Latest Multimedia

sponsored by

Mining Weekly Editor Martin Creamer
Copper shares soar and green hydrogen goes digital
26th April 2024
Magazine cover image
Magazine round up | 26 April 2024
26th April 2024

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION







sq:0.06 0.122s - 92pq - 2rq
1:
1: United States
Subscribe Now
2: United States
2: