https://www.miningweekly.com
Business|Construction|Exploration|PROJECT|Solar|Technology|Water
Business|Construction|Exploration|PROJECT|Solar|Technology|Water
business|construction|exploration|project|solar|technology|water

Rio Tinto reviews $140m estimate for Argentina lithium starter plant

19th July 2023

By: Mariaan Webb

Creamer Media Senior Deputy Editor Online

     

Font size: - +

Diversified miner Rio Tinto said on Tuesday that it was reviewing the $140-million cost estimate and schedule for the development of a starter plant at its Rincon lithium project, in Argentina.

The company cited cost escalations as the reason for the review.

Rio Tinto acquired the Rincon project last year, as part of its strategy to strengthen its presence in the battery materials business. The project aims to establish a 3 000 t/y lithium carbonate starter plant at the site.

Despite the ongoing review, Rio Tinto assured that development work is still progressing. The company has made headway in the construction of the camp and airstrip for the project, with ongoing enabling works for the process plant.

Further, studies for the full-scale operation are ongoing and the miner has been carrying out exploration to further understand the basin, brine and water reservoirs.

Rio Tinto sees significant potential in the Rincon project, stating that it could become a long-life, scaleable resource capable of producing high-grade lithium carbonate. The direct lithium extraction technology proposed for the project has the potential to significantly increase lithium recoveries as compared to solar evaporation ponds.

Edited by Creamer Media Reporter

Comments

 

Showroom

SMS group
SMS group

At SMS group, we have made it our mission to create a carbon-neutral and sustainable metals industry.

VISIT SHOWROOM 
WearCheck
WearCheck

Leading condition monitoring specialists, WearCheck, help boost machinery lifespan and reduce catastrophic component failure through the scientific...

VISIT SHOWROOM 

Latest Multimedia

sponsored by

Magazine round up | 10 May 2024
Magazine round up | 10 May 2024
10th May 2024

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION







sq:0.159 0.195s - 107pq - 2rq
1:
1: United States
Subscribe Now
2: United States
2: