https://www.miningweekly.com

Resolute turns eye to Egypt

6th July 2017

By: Esmarie Iannucci

Creamer Media Senior Deputy Editor: Australasia

     

Font size: - +

PERTH (miningweekly.com) – Gold miner Resolute Mining has been awarded two large scale exploration concessions in Egypt, advancing the company’s strategy of building a portfolio of exploration and development assets in highly prospective regions.

“We are pleased to have been successful in our application for these large-scale exploration concessions in Egypt,” said Resolute MD and CEO John Welborn.

“We are eager to secure new high-quality exploration assets on the African continent that provide the opportunity to discover and develop future gold mines. The Bokari and Um Samra concessions fit our criteria of exploration tenure within well-endowed gold belts that have potential to yield large mineable deposits.”

The Bokari and Um Samra concessions cover 1 583 km2 and 819 km2, respectively, and are located some 70 km and 100 km from the Sukari gold mine, operated by London-based Centamin.

Both the concessions contain extensive artisanal workings, but have not been subject to significant modern exploration work.

While Resolute was optimistic about the new tenures, the miner warned that it would have to negotiate "appropriate fiscal terms" with the Egyptian government before any development work could be considered at either project.

Egypt has adopted a production sharing agreement (PSA), under which the concession holder would pay the government a production share, in addition to a royalty.

Centamin had previously taken the decision not to participate in the bid process for the two concessions on the basis that the PSA terms were not commercial, with the Sukari mine currently operating under a cost recovery model, rather than the PSA.

Resolute said on Thursday that the company was committed to working with the Egyptian government towards establishing a set of terms that would meet the needs of both parties. The company noted that the current PSA model posed "significant challenges" for gold miners, adding that it limited the potential for the successful development of gold mines.

Edited by Creamer Media Reporter

Comments

Projects

Image of lithium ore stockpile
Lithium conversion plant, Australia
Updated 1 hour 45 minutes ago By: Sheila Barradas
Aerial view of the Amapá mine
Amapá iron-ore project, Brazil
Updated 1 hour 45 minutes ago By: Sheila Barradas

Showroom

Universal Storage Systems (SA)
Universal Storage Systems (SA)

South African leader in Steel -Racking, -Shelving, and -Mezzanine flooring. Universal has innovated an approach which encompasses conceptualising,...

VISIT SHOWROOM 
Flameblock
Flameblock

FlameBlock is a proudly South African company that engineers, manufactures and supplies fire intumescent and retardant products to the fire...

VISIT SHOWROOM 

Latest Multimedia

sponsored by

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION







sq:0.096 0.136s - 90pq - 2rq
1:
1: United States
Subscribe Now
2: United States
2: