Request to quash Omagh underground consent denied
JOHANNESBURG (miningweekly.com) – Toronto-headquartered Galantas Gold is continuing with underground development at its Omagh gold mine, in Northern Ireland, after a court ruling denied a third-party request to set aside planning consent.
The Belfast High Court on Friday delivered judgment in a judicial review into the planning consent that the Department of Environment Northern Ireland (DOENI) granted in 2015. The consent permits the underground mining of gold veins that were recently worked in upper levels of Omagh’s openpit.
A third party has tried to quash the consent, claiming that the DOENI had breached regulations.
Galantas said the planning consent was the result of “exhaustive study and examination” by the DOENI, which is now in the Department for Infrastructure. The consent included a number of conditions, including monitoring and restoration matters.
Galantas CEO Roland Phelps points out that the Omagh operation, in county Tyrone, boasts “excellent past environmental performance”.
“The processing plant uses a nontoxic, froth-flotation process to produce gold concentrate which is exported via Belfast to a well-regulated Canadian smelter. No cyanide or mercury is used. Regular water monitoring demonstrates compliance with regulatory standards and there is no acid rock drainage at the site.”
The processing plant and tailings facility at Omagh is on standby, awaiting mineralised material from the underground mine.
Underground development is under way and the company has a plan to accelerate progress, in line with the confirmed consent. The plan, Phelps says, includs additional employment opportunities locally.
An underground mine at Omagh is expected to produce 27 542 oz over a six-year mine life, with output peaking at 36 411 oz/y in the third year of operations. About 157 700 t of ore will be processed in the six years.
Shares in Galantas were suspended early on Friday, but surged when trading resumed following a positive outcome to the judicial review. The company’s stock on the Aim fetched 7p in the late afternoon, compared with 5.12p before trading was suspended.
Galantas is also listed on the TSX-V.
Comments
Press Office
Announcements
What's On
Subscribe to improve your user experience...
Option 1 (equivalent of R125 a month):
Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format
Option 2 (equivalent of R375 a month):
All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors
including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.
Already a subscriber?
Forgotten your password?
Receive weekly copy of Creamer Media's Engineering News & Mining Weekly magazine (print copy for those in South Africa and e-magazine for those outside of South Africa)
➕
Recieve daily email newsletters
➕
Access to full search results
➕
Access archive of magazine back copies
➕
Access to Projects in Progress
➕
Access to ONE Research Report of your choice in PDF format
RESEARCH CHANNEL AFRICA
R4500 (equivalent of R375 a month)
SUBSCRIBEAll benefits from Option 1
➕
Access to Creamer Media's Research Channel Africa for ALL Research Reports on various industrial and mining sectors, in PDF format, including on:
Electricity
➕
Water
➕
Energy Transition
➕
Hydrogen
➕
Roads, Rail and Ports
➕
Coal
➕
Gold
➕
Platinum
➕
Battery Metals
➕
etc.
Receive all benefits from Option 1 or Option 2 delivered to numerous people at your company
➕
Multiple User names and Passwords for simultaneous log-ins
➕
Intranet integration access to all in your organisation