Randgold upbeat on Tongon recovery
JOHANNESBURG (miningweekly.com) – After spending the past year building a solid foundation for the future growth of the Tongon gold mine, Randgold Resources believes the Côte d'Ivoire-based mine will deliver on its design capabilities in 2015.
CEO Mark Bristow said on Tuesday that a recovery programme, implemented in 2014, was producing “signs of improvement” in key areas, including throughput and recovery, with generally improving efficiencies and the curbing of costs.
“Serious” technical issues, such as the replacement of a faulty crushing circuit, were also effectively dealt with, with the London- and Nasdaq-listed gold mining company reporting that the beneficial effects of those improvements were emerging.
Further, the full flotation circuit upgrade, which would lift the recovery rate to its feasibility study level, was on track for completion by the end of the quarter, he said.
Despite enhancing efficiency levels and increasing production, Tongon had struggled to reach 80% recovery rates during 2014.
However, Bristow said the group was still awaiting approval of new permits to enable Randgold to start “reaping the benefits of all the good work that has been done”.
Comments
Press Office
Announcements
What's On
Subscribe to improve your user experience...
Option 1 (equivalent of R125 a month):
Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format
Option 2 (equivalent of R375 a month):
All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors
including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.
Already a subscriber?
Forgotten your password?
Receive weekly copy of Creamer Media's Engineering News & Mining Weekly magazine (print copy for those in South Africa and e-magazine for those outside of South Africa)
➕
Recieve daily email newsletters
➕
Access to full search results
➕
Access archive of magazine back copies
➕
Access to Projects in Progress
➕
Access to ONE Research Report of your choice in PDF format
RESEARCH CHANNEL AFRICA
R4500 (equivalent of R375 a month)
SUBSCRIBEAll benefits from Option 1
➕
Access to Creamer Media's Research Channel Africa for ALL Research Reports on various industrial and mining sectors, in PDF format, including on:
Electricity
➕
Water
➕
Energy Transition
➕
Hydrogen
➕
Roads, Rail and Ports
➕
Coal
➕
Gold
➕
Platinum
➕
Battery Metals
➕
etc.
Receive all benefits from Option 1 or Option 2 delivered to numerous people at your company
➕
Multiple User names and Passwords for simultaneous log-ins
➕
Intranet integration access to all in your organisation