https://www.miningweekly.com

Ramp-up for Anglo American's Minas Rio mine likely delayed to 2021

16th October 2018

By: Reuters

  

Font size: - +

RIO DE JANEIRO – Anglo American should restart operations at its Brazilian Minas Rio iron ore mine in November or December but a planned ramp-up to 26.5-million tonnes per year is likely to be pushed back to 2021 from 2020 as previously expected, the miner's Brazil chief said on Tuesday.

The company halted production at its Minas Rio mine after two leaks in March in a pipeline that channels slurry more than 500 km from the mine in Minas Gerais state to a port in Rio de Janeiro state.

It has been inspecting the pipeline from April through October, and is working to change out about 4 kilometers of it out of caution after it discovered cracks in the welding.

"We should finish the replacement in November. So everything is on track for us to resume operations in the fourth quarter. It could be in November or December," Brazil CEO Ruben Fernandes told Reuters on the sidelines of a commodities conference in Rio de Janeiro.

Purchased at the height of the commodities boom a decade ago for $5.5-billion, Minas Rio is Anglo American's biggest development project. The London-based company was once counting on Minas-Rio to produce 26.5-million tons of iron ore by 2016. As the project hit delays, it had shifted that output goal for 2020.

The company clinched two key permits to ramp up production towards that goal in January, but now expects to receive the key operating license in May, 2019. That means production is likely to hit that long-awaited target of 26.5-million tonnes in 2021.

"It would be around 2021. It is not a very firm date because it depends on the plant's performance," Fernandes said, adding that production should hit the target pace by the last few months of 2020.

Fernandes reiterated Anglo American's prior estimate of a $300 million to $400 million impact on earnings from the spills this year.

In June, Reuters reported that Anglo American had suspended a nearly $1 billion annual contract to supply Bahrain Steel with iron ore by declaring force majeure in April after the spills.

At the time, Anglo American declined to comment. On Tuesday, Fernandes acknowledged that the two companies were already in arbitration to renegotiate the contract prior to the declaration of force majeure following the spills.

He described the talks as friendly, noting that they include issues like volume and quality, in addition to the incident.

"Without a doubt they are an excellent client," he said of the Gulf-based company. "There is no reason why we won't reach a long term deal with them."

Fernandes said Anglo was also in arbitration with Ferroport, a joint venture it has with port operator Prumo Logistica, after declaring force majeure on that contract as well.

Edited by Reuters

Comments

Latest News

The QB mine in Chile is ramping up.
Teck increases copper production with QB ramp-up
25th April 2024 By: Mariaan Webb

Showroom

Booyco Electronics
Booyco Electronics

Booyco Electronics, South African pioneer of Proximity Detection Systems, offers safety solutions for underground and surface mining, quarrying,...

VISIT SHOWROOM 
SMS group
SMS group

At SMS group, we have made it our mission to create a carbon-neutral and sustainable metals industry.

VISIT SHOWROOM 

Latest Multimedia

sponsored by

Mining Weekly Editor Martin Creamer
Copper shares soar and green hydrogen goes digital
26th April 2024
Magazine cover image
Magazine round up | 26 April 2024
26th April 2024

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION







sq:0.133 0.172s - 106pq - 2rq
1:
1: United States
Subscribe Now
2: United States
2: