Rambler delivers successive better-than-planned quarter
VANCOUVER (miningweekly.com) – Maritime Canada gold and copper producer Rambler Metals & Mining has reported a second consecutive stellar performance from its flagship Ming mine, in Newfoundland and Labrador, during the three months ended October 31.
For the first fiscal quarter of 2017, the Aim- and TSX-V-listed miner produced 69 609 t of ore, in line with the previous quarter, and a near-20% improvement on the comparable prior-year quarter.
Rambler achieved the improved performance while continuing its expansion into the lower footwall zone (LFZ) and implementing project optimisation for the Phase 2 expansion, with a new projected mine life of more than 21 years.
“During the next two to three quarters we envisage a steady increase in production rates targeting our first expansion milestone of 1 250 t/d from the mine by mid-2017. Through this LFZ development we will enable the mine to continuously deliver at these higher targeted rates by incorporating much larger stoping blocks into the production plan,” said president and CEO Norman Williams.
Revenue in the quarter eased to $6.96-million, from $8.5-million in the same period of 2015, after adjustments arising from second provisional invoices and final settlement of provisional invoices.
Underlying earnings, or Ebitda, declined to $349 000, from $2.22-million the previous year.
The after-tax net loss for the period was $1.8-million, or $0.004 a share, which compares with a loss of $12.8-million, or $0.067 a share for the prior quarter and a profit of $300 000, or $0.001 a share for the same quarter a year earlier. Rambler ascribed the narrower net loss to a noncash impairment charge recorded in the fourth quarter, and the greater year-on-year loss to lower output and lower prices.
Shares in Rambler fell as much as 1.3% to 9.50p in London, having more than tripled in value since the start of this year.
Comments
Press Office
Announcements
What's On
Subscribe to improve your user experience...
Option 1 (equivalent of R125 a month):
Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format
Option 2 (equivalent of R375 a month):
All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors
including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.
Already a subscriber?
Forgotten your password?
Receive weekly copy of Creamer Media's Engineering News & Mining Weekly magazine (print copy for those in South Africa and e-magazine for those outside of South Africa)
➕
Recieve daily email newsletters
➕
Access to full search results
➕
Access archive of magazine back copies
➕
Access to Projects in Progress
➕
Access to ONE Research Report of your choice in PDF format
RESEARCH CHANNEL AFRICA
R4500 (equivalent of R375 a month)
SUBSCRIBEAll benefits from Option 1
➕
Access to Creamer Media's Research Channel Africa for ALL Research Reports on various industrial and mining sectors, in PDF format, including on:
Electricity
➕
Water
➕
Energy Transition
➕
Hydrogen
➕
Roads, Rail and Ports
➕
Coal
➕
Gold
➕
Platinum
➕
Battery Metals
➕
etc.
Receive all benefits from Option 1 or Option 2 delivered to numerous people at your company
➕
Multiple User names and Passwords for simultaneous log-ins
➕
Intranet integration access to all in your organisation