Prieska copper/zinc project, South Africa

9th August 2019

By: Sheila Barradas

Creamer Media Research Coordinator & Senior Deputy Editor

     

Font size: - +

Name of the Project
Prieska copper/zinc project.

Location
Northern Cape, South Africa.

Project Owner/s
Orion Minerals.

Project Description
A bankable feasibility study (BFS) on the foundation phase of the Prieska project has confirmed the quality and scale of the project. The BFS evaluates the establishment of new mining operations at the Prieska copper mine, which has been closed since 1991.

The project has a maiden ore reserve of 13.62-million tonnes at 1.1% copper and 3.2% zinc for 143 000 t of contained copper and 433 000 t of contained zinc.

The BFS has investigated the commercial viability of a mining plan for the foundation phase aimed at establishing mine infrastructure and operational capacity, which are intended to establish the platform for further mining of deposit extensions, and the exploration and mine development of neighbouring prospects.

According to the BFS, the foundation phase runs for ten years of run-of-mine production at a design ore processing rate of 2.4-million tonnes a year. This phase targets the exploitation of those portions of the Prieska deposit that have been upgraded to indicated and inferred mineral resources from the first surface-based drilling campaign conducted from 2017 to 2018. The production target comprises 65% probable ore reserves and 35% inferred mineral resources, with ore reserves predominating during the early stages of the mining plan.

Underground and surface mining methods are planned to be used for the duration of the foundation phase, in conjunction with conventional froth-flotation concentration to produce differentiated copper and zinc concentrates for export.

Beyond the Foundation Phase, it is expected that mine-life extension will be underpinned by delineated mineral resources not yet incorporated into the mining plan and known deposit extensions and existing pillars, which are expected to require low or no additional capital investment to extend the mine life. An estimated 9.7-million tonnes of indicated and inferred mineral resources, at grades of 1.1% copper and 3.6% zinc, remain outside the immediate mining plan, providing near-term potential to optimise mine plans to incorporate more of these resources into the foundation phase. Significant potential for nearby satellite deposits has also been identified.

The project has a mine life of 9.7 years.

Potential Job Creation
Not stated.

Net Present Value/Internal Rate of Return
The project has a pretax net present value, at an 8% discount rate, of A$574-million and an internal rate of return of 38%, with a payback of 2.9 years from first production.

Capital Expenditure
The project has a peak funding requirement of A$378-million.

Planned Start/End Date
A two-year construction period is scheduled to be followed by the production of the first copper.

Latest Developments
Orion Minerals has welcomed a new black economic-empowerment (BEE) member to its BEE partner company Prieska Resources.

Safika Resources, chaired by Saki Macozoma, has taken a 44.72% stake in Prieska Resources, with Black Star Minerals holding a 17.31% interest and Kolobe Nala Investment a 37.97% interest. Prieska Resources will ultimately hold a 20% stake in Orion’s Prieska copper/zinc project.

Meanwhile, Orion has started several work streams following the release of its BFS for its Prieska copper/zinc project.

Work has started on completing pilot-scale field trials on various aspects of mine dewatering, including the testing of water qualities, refining the proposed pumping system and investigating cost-effective water treatment options.

Orion will also follow up on the optimisation opportunities identified in the BFS, including mine-to-market enterprise optimisation of the foundation-phase mining plans. Work is also under way to formalise key supply contracts to fast-track preconstruction activities and lock in competitive pricing for critical plant and equipment.

Key Contracts and Suppliers
DRA Projects South Africa; A&B Global Mining; ABS Africa; BPDT & Co; Bluhm Burton Engineering & Ventilation Consultants; Beulah Africa; Cart Investments; Earth Science Solutions; Endeavour Financial Limited; Falcon & Hume Attorneys; Fraser McGill Mining & Minerals Advisory; Knight Piésold; METC Engineering Consultants; Mets Consulting South Africa; Patterson & Cooke; PCDS Consultants; Power Plant Electrical Technologies; Professional Cost Consultants; Questco; Shift Innovations; Steffen, Robertson & Kirsten South Africa; The MSA Group; Turnkey Civil (International) Group; VBKom Engineering Consultants; and Z Star Mineral Resource Consultants (BFS).

On Budget and on Time?
Not stated.

Contact Details for Project Information
Orion Minerals, tel +27 11 880 3159 or email info@orionminerals.com.au.

Edited by Creamer Media Reporter

Comments

Showroom

Alco-Safe
Alco-Safe

Lion Alcoblow ® - High speed breathalyser

VISIT SHOWROOM 
Booyco Electronics
Booyco Electronics

Booyco Electronics, South African pioneer of Proximity Detection Systems, offers safety solutions for underground and surface mining, quarrying,...

VISIT SHOWROOM 

Latest Multimedia

sponsored by

Magazine round up | 03 May 2024
Magazine round up | 03 May 2024
3rd May 2024

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION







sq:0.153 0.211s - 94pq - 2rq
1:
1: United States
Subscribe Now
2: United States
2: