Potash West improves Dinner Hill economics
PERTH (miningweekly.com) – ASX-listed Potash West has improved the economics of its Dinner Hill phosphate project, in Western Australia, after processing a chalk seam was taken into account.
The company reported on Tuesday that an updated economic model on the production of a single superphosphate at the Dinner Hill phosphate resource had increased the expected net present value from the A$218-million estimated in the scoping study, to A$331-million.
The project’s internal rate of return has also increased to 30%, instead of the 26% estimated in the 2013 scoping study.
The project’s capital cost estimate remains unchanged at A$144-million, with the project expected to process at a rate of 3.8-million tonnes a year, over a 20-year mine life, to deliver 340 000 t/y of superphosphate.
Potash West MD Patrick McManus told shareholders that the ability to process chalk had resulted in a significant improvement in the economic modelling outcomes for the project.
“The fact that chalk can be processed simplifies the mining and significantly reduces those costs. Excitingly, this recent work has made a very robust project, with good payback, internal rates of returns and net present values even stronger.”
He added that Potash West’s studies have also identified that the phosphate mineralisation could be significantly upgraded relatively simply and cheaply, which would allow for small downstream processing units and significantly reduced start-up costs.
“Importantly, the positive outcomes of the study provide Potash West with the confidence to move forward towards a definitive feasibility study,” McManus said.
Comments
Press Office
Announcements
What's On
Subscribe to improve your user experience...
Option 1 (equivalent of R125 a month):
Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format
Option 2 (equivalent of R375 a month):
All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors
including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.
Already a subscriber?
Forgotten your password?
Receive weekly copy of Creamer Media's Engineering News & Mining Weekly magazine (print copy for those in South Africa and e-magazine for those outside of South Africa)
➕
Recieve daily email newsletters
➕
Access to full search results
➕
Access archive of magazine back copies
➕
Access to Projects in Progress
➕
Access to ONE Research Report of your choice in PDF format
RESEARCH CHANNEL AFRICA
R4500 (equivalent of R375 a month)
SUBSCRIBEAll benefits from Option 1
➕
Access to Creamer Media's Research Channel Africa for ALL Research Reports on various industrial and mining sectors, in PDF format, including on:
Electricity
➕
Water
➕
Energy Transition
➕
Hydrogen
➕
Roads, Rail and Ports
➕
Coal
➕
Gold
➕
Platinum
➕
Battery Metals
➕
etc.
Receive all benefits from Option 1 or Option 2 delivered to numerous people at your company
➕
Multiple User names and Passwords for simultaneous log-ins
➕
Intranet integration access to all in your organisation