https://www.miningweekly.com

Plateau clears first social hurdle on road to project permitting

17th November 2016

By: Henry Lazenby

Creamer Media Deputy Editor: North America

  

Font size: - +

VANCOUVER (miningweekly.com) – Project developer Plateau Uranium has passed the first major milestone on the way to production permitting and a full environmental impact assessment (EIA) study for its Macusani uranium project, in Peru.

Andean communities and the Peruvian Environmental Authority have accepted and approved the TSX-V-listed company’s environmental baseline study lodged in September.

"Acceptance and approvals for the design, scope and methodology of the baseline study received from environmental authorities is a further indication of Peruvian government support for the project and is the first step towards permitting future uranium and lithium production,” stated CEO Ted O'Connor.

Following the acceptance approvals, the company has mobilised its environmental and engineering consultant to initiate the baseline study monitoring and sample collection in the area of interest and to proceed with the other technical, biological, hydrological, social, cultural and archaeological studies in the project area that will allow Plateau to proceed with the future EIA study necessary for future production permitting.

Plateau owns significant uranium exploration properties in the Puno province, in south-eastern Peru, and it is considered one of the largest undeveloped uranium projects in the world containing large measured, indicated and inferred uranium resources. The company was formerly known as Macusani Yellowcake, and effected a name change on May 1, 2015, together with a one-for-eight share consolidation.

The company controls over 1 000 km² of territory on the Macusani plateau, where it has established a compliant indicated resource estimate of 51.9-million pounds at 248 parts per million (ppm) uranium oxide (U3O8) and 72.1-million pounds grading 251 ppm U3O8 in the inferred category, when using 75 ppm uranium cutoff.

At 200 ppm uranium cutoff, Plateau has defined higher-grade resources of 32.8-million pounds at 445 ppm U3O8 in the indicated category and 45.9-million pounds grading at 501 ppm U3O8 in the inferred category.

Plateau has also defined initial lithium and potassium resource estimates within four of the company’s uranium deposits. These comprise 67 000 t of lithium oxide (Li2O) at 0.13% Li2O, 2.34-million tonnes potassium oxide (K2O) at 4.47 % K2O and 31-million pounds U3O8 at 268 ppm U3O8, all in the indicated category. It also holds 109 000 t of Li2O at 0.12% Li2O, 3.93-million tonnes K2O at 4.49 % K2O and 54.8-million pounds U3O8 at 283 ppm U3O8, all in the inferred category.

With the updated preliminary economic assessment filed in February based on uranium prices of $50/lb U3O8 over the ten-year life-of-mine, current uranium spot prices are not spurring new developments. Uranium spot prices have more than halved over the past 12 months to stand at $18.50/lb on Monday, according to advisory firm UxC.

Edited by Samantha Herbst
Creamer Media Deputy Editor

Comments

Showroom

WearCheck
WearCheck

Leading condition monitoring specialists, WearCheck, help boost machinery lifespan and reduce catastrophic component failure through the scientific...

VISIT SHOWROOM 
M and J Mining
M and J Mining

M and J Mining are leading suppliers of physical support systems as used by the underground mining industry. Our selection of products are not...

VISIT SHOWROOM 

Latest Multimedia

sponsored by

Mining Weekly Editor Martin Creamer
Copper shares soar and green hydrogen goes digital
26th April 2024
Magazine cover image
Magazine round up | 26 April 2024
26th April 2024

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION







sq:0.153 0.19s - 90pq - 2rq
1:
1: United States
Subscribe Now
2: United States
2: